12.07.2015 Views

ILOG CPLEX 11.0 User's Manual

ILOG CPLEX 11.0 User's Manual

ILOG CPLEX 11.0 User's Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C H A P T E R22Early Tardy SchedulingThis chapter shows you one way of using <strong>ILOG</strong> <strong>CPLEX</strong> to solve a scheduling problem. In it,you will see how to use logical constraints, piecewise linear functions, and aggressive MIPemphasis.◆ Describing the Problem on page 368◆ Understanding the Data File on page 368◆ Reading the Data on page 369◆ Creating Variables on page 369◆ Stating Precedence Constraints on page 370◆ Stating Resource Constraints on page 370◆ Representing the Piecewise Linear Cost Function on page 370◆ Transforming the Problem on page 371◆ Solving the Problem on page 372This chapter walks through the C++ implementation. You can compare the Javaimplementation of the same model, using logical constraints, piecewise linear functions, andaggressive MIP emphasis in Etsp.java, and the C#.NET implementation in Etsp.cs, andthe VB.NET implementation in Etsp.vb as well.<strong>ILOG</strong> <strong>CPLEX</strong> <strong>11.0</strong> — USER’ S MANUAL 367

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!