12.07.2015 Views

MEPC 49/22/Add.2 ANNEX 13 RESOLUTION MEPC.107(49 ... - Bimco

MEPC 49/22/Add.2 ANNEX 13 RESOLUTION MEPC.107(49 ... - Bimco

MEPC 49/22/Add.2 ANNEX 13 RESOLUTION MEPC.107(49 ... - Bimco

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MEPC</strong> <strong>49</strong>/<strong>22</strong>/<strong>Add.2</strong><strong>ANNEX</strong> <strong>13</strong>Page 106.2 15 ppm Bilge Alarm6.2.1 The layout of the installation should be arranged so that the overall response time(including the response time of the 15 ppm Bilge Alarm) between an effluent discharge from the15 ppm Bilge Separator exceeding 15 ppm, and the operation of the Automatic Stopping Devicepreventing overboard discharge, should be as short as possible and in any case not more than20 s.6.2.2 The arrangement on board ship for the extraction of samples from the 15 ppm BilgeSeparator discharge line to the 15 ppm Bilge Alarm should give a truly representative sample ofthe effluent with an adequate pressure and flow.6.2.3 A vessel fitted with a 15 ppm Bilge Alarm should, at all times, have on board a copy ofthe Operating and Maintenance manuals.I:\<strong>MEPC</strong>\<strong>49</strong>\<strong>22</strong>-ADD.2.DOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!