LE-PROFILE | ver.3 | rev.5.4 | 28-Mar-2012<br />

LINDENBERG-EMIRATES LLC


<strong>Company</strong> <strong>Profile</strong> 3~16<br />

� About <strong>Lindenberg</strong> <strong>Emirates</strong> 3<br />

� Scope of Activities 4<br />

� Completed Projects 5<br />

� Ongoing Projects 6~7<br />

� Representation of <strong>Lindenberg</strong> Anlagen 8<br />

� <strong>Company</strong> Organization Chart 9<br />

� <strong>Company</strong> Manpower Chart 10<br />

� <strong>Company</strong> Reg., PQ & Classification 11~14<br />

� Project References 15~16<br />

<strong>Lindenberg</strong> Power Division 17~33<br />

� Division <strong>Profile</strong> 17~18<br />

� Scope of Activities 19<br />

� Typical Power Project Organization Chart 20<br />

� Featured Projects 21~32<br />

� Power Stations 33<br />

<strong>Lindenberg</strong> Water & Drainage Division 34~46<br />

� Division <strong>Profile</strong> 34~35<br />

� Scope of Activities 35<br />

� Typical Water Project Organization Chart 36<br />

� Featured Projects 37~46<br />

Quality, Health & Safety & Environment 47~48<br />

<strong>Company</strong> Recourses 49~57<br />

� Workforce & Labour Camp 49<br />

� Store Facilities 50<br />

� Plant, Machinery, Vehicles & Equipments 51<br />

Contact Information 52


3<br />

About <strong>Lindenberg</strong>-<strong>Emirates</strong><br />

Located in the United Arab <strong>Emirates</strong>, with<br />

its center of operation and main office in<br />

Abu Dhabi, <strong>Lindenberg</strong>-<strong>Emirates</strong> LLC<br />

specializes in Engineering, Procurement,<br />

and Construction (EPC) mode of project<br />

delivery.<br />

<strong>Lindenberg</strong>-<strong>Emirates</strong> LLC employs manpower expertise in all aspects of contracting including civil<br />

engineering, pipeline construction, turn-key industrial plants, substations, mechanical and electrical<br />

installations, and services to the electromechanical industry including testing, commissioning,<br />

maintenance and operational activities.<br />

<strong>Company</strong> Details<br />

� Date Established: 20.11.2001<br />

� Ownership: UAE Partner 51%, <strong>Lindenberg</strong> Anlagen (Germany) 49%<br />

� Incorporated in: Abu Dhabi, United Arab <strong>Emirates</strong><br />

� Principal Bankers: Arab Bank for Investment Foreign Trade Mashreqbank<br />

National Bank of Abu Dhabi HSBC Bank<br />

National Bank of Fujairah


4<br />

Scope of Activities<br />

Power Related Activities<br />

� Construction & Installation of Power Transmission and Distribution Networks<br />

� Installation of High Voltage Cables<br />

� Substation Turnkey Low, Medium and High Voltage & Package Substation Installation<br />

� High & Medium Voltage Switchgear & Transformer Installation<br />

� Submarine Cable Installation<br />

Civil & Electro-mechanical General Contracting<br />

� Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks<br />

� EPC Projects of Water & Sewerage including Pumping Stations<br />

� Submarine Pipe Laying<br />

Oil & Gas Related Activities<br />

� On Shore and Off Shore Oil and Gas Field Services<br />

� Maintenance Services for Oil/Gas Production Utilities<br />

� Technical Maintenance for Equipment, Industrial and Petroleum Plant<br />

Repair & Maintenance Works<br />

� Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines


5<br />

Projects Successfully Completed in U.A.E. Project Value (AED)<br />

� Power Supply for Presidential Palaces and Hospitals 177 Million<br />

� Construction of Water Supply Network to Sadiyat Island 108 Million<br />

� Power Supply for Presidential Palaces and Hospitals 103 Million<br />

� Construction of Water Transmission Pipeline in Baniyas 94 Million<br />

� Construction of Water Transmission Pipeline in Dubai 84 Million<br />

� Water Transmission Lines inside Al Reem Island 56 Million<br />

� Security & Upgrading of 11kV Electrical Networks 40 Million<br />

� Supply of LV Panels Switchgear for Ruwais Housing Complex 29 Million<br />

� Power Supply for Palaces and Hospitals Stage3 26 Million<br />

� Construction of Water Transmission Line from Sweihan to Remah 26 Million<br />

� Transfer of 11kV Load & Primary Substation in Abu Dhabi 19 Million<br />

� Modification of Switching Stations in Abu Dhabi 17 Million


6<br />

Ongoing Power & Civil Projects in Abu Dhabi, U.A.E. Project Value (AED)<br />

� Replacement of 11 KV Switchgears and Substations 82 Million<br />

� Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34 Million<br />

� Civil Works for Shuweihat S3 Independent Power Plant 29 Million<br />

� Supply and Installation of 11kV Package Unit Substation for Braka<br />

Nuclear Power Plant<br />

16.8 Million<br />

� Transfer of 11kV Load to New 132/11kV W02 Primary Substation 13.6 Million<br />

� Distribution Network Expansion for Farms & Ezabs Belonging to VIP<br />

Customers in Eastern Region<br />

� Installation of 22kV cables from 132/22 kVA - A Beach Primary to Masdar<br />

City<br />

13 Million<br />

2 Million


7<br />

Ongoing Water & Drainage Projects in Abu Dhabi, U.A.E. Project Value (AED)<br />

� Water Transmission Scheme inside Sadiyat Island 577 Million<br />

� Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan 180 Million<br />

� EPC for 2 Nos. 25 MiG Steel Tanks & associated Civil & Pipeline Works 174.5 Million<br />

� Replacement of Existing Sewer Networks Inside Abu Dhabi Island 116 Million<br />

� Construction of Sewerage Connections and Related Works in Abu Dhabi 80 Million<br />

� Enhancement of Sector Main Loop for Sector E25 in Abu Dhabi City 7 Million<br />

� Sheikh Khalifa Interchange, Water Pipeline Diversion 2.8 Million


8<br />

Representation of <strong>Lindenberg</strong> Anlagen<br />

<strong>Lindenberg</strong> <strong>Emirates</strong> represents <strong>Lindenberg</strong> Anlagen GmbH Germany for its products and services in<br />

the United Arab <strong>Emirates</strong>.<br />

<strong>Lindenberg</strong> Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power<br />

Generation System and has international presence in more than 72 countries.<br />

For more information about <strong>Lindenberg</strong> Anlagen GmbH, please visit www.lindenberg-anlagen.de.


9<br />

<strong>Company</strong> Organization Chart<br />

FINANCE &<br />

ACCOUNTS<br />

DEPARTMENT<br />

Treasury Manager<br />

Accounts Manager<br />

Sr. Accountants<br />

Accountants<br />

Secretary<br />

IT DEPARTMENT<br />

IT Administrator<br />

and Team<br />

FINANCE &<br />

ACCOUNTS<br />

DEPARTMENT<br />

Finance<br />

Director<br />

BUSINESS<br />

SYSTEM - ERP<br />

DEPARTMENT<br />

Business Systems<br />

Analyst<br />

RECRUITMENT<br />

DEPARTMENT<br />

Recruitment<br />

Manager<br />

Recruitment Assistant<br />

DOCUMENTS<br />

CONTROL<br />

DEPARTMENT<br />

Document Controller<br />

PURCHASING<br />

DEPARTMENT<br />

Commercial<br />

Manager<br />

Procurement Engrs.<br />

Asst. Proc. Engrs.<br />

Purchase Officers<br />

Secretary<br />

HR / ADMIN<br />

DEPARTMENT<br />

HR/Admin<br />

Manager<br />

Sr. HR/Admin Officer<br />

Personnel Officer<br />

Asst. Personnel Off’r.<br />

Sr. Administrator<br />

PRO<br />

Doc. Controller<br />

Admin Clerk<br />

Camp Boss<br />

Asst. Camp Boss<br />

ESTIMATION &<br />

TENDERING<br />

DEPARTMENT<br />

Estimation<br />

Manager<br />

Senior Business<br />

Associate<br />

Sr. Estimation Engrs.<br />

Estimation Engrs.<br />

Secretary<br />

PLANT /<br />

WORKSHOP<br />

DEPARTMENT<br />

Plant Manager<br />

W/S Superintendent<br />

W/S Administrator<br />

Foremen Mechanics<br />

Mechanics<br />

Storekeeper<br />

PRO Plant<br />

Office Asst.<br />

CHAIRMAN<br />

GENERAL<br />

MANAGER<br />

OPERATIONS<br />

DEPARTMENT<br />

Operations<br />

Manager<br />

POWER<br />

DIVISION<br />

Asst. Operations<br />

Manager - LPD<br />

Projects Manager<br />

Construction Mngrs.<br />

Design Engineers<br />

Project Engineers<br />

T&C Engineers<br />

Sr. Qty Surveyor<br />

Quantity Surveyor<br />

Exec. Secretary<br />

Proj. Support Team<br />

Foremen<br />

Work Crew<br />

Exec. Secretary /<br />

Doc. Controller<br />

Office Manager<br />

Exec. Sec. / D.C.<br />

Admin Clerk<br />

Senior Administrator<br />

CONTRACTS<br />

DEPARTMENT<br />

Contracts<br />

Manager<br />

Secretary<br />

WATER &<br />

DRAINAGE<br />

DIVISION<br />

Division Manager -<br />

LWD<br />

Project Managers<br />

Construction Mngrs.<br />

Project Engineers<br />

Sr. Qty. Surveyors<br />

Quantity Surveyors<br />

I & C Engineers<br />

Exec. Secretary<br />

Secretary<br />

Doc. Controller<br />

Proj. Support Team<br />

Foremen<br />

Work Crew<br />

CIVIL<br />

DEPARTMENT<br />

Civil Department<br />

Manager<br />

Projects Manager<br />

Construction Mngr.<br />

Design Engineers<br />

Project Engineers<br />

Quantity Surveyors<br />

Proj. Support Team<br />

Foremen<br />

Work Crew<br />

LEGAL<br />

DEPARTMENT<br />

Head of Legal<br />

Department<br />

Legal Advisor<br />

COST CONTROL<br />

DEPARTMENT<br />

Cost Control<br />

Manager<br />

Legal Secretary<br />

Lead Cost Control<br />

Engineer<br />

Technical Secretary<br />

PLANNING<br />

DEPARTMENT<br />

Planning Department<br />

Manager<br />

Sr. Planning Engrs.<br />

Planning Engineers<br />

BUSINESS<br />

DEVELOPMENT<br />

DEPARTMENT<br />

Business<br />

Development<br />

Director<br />

Business Dev’t.<br />

Associate<br />

Sales Engineer<br />

Secretary<br />

HSE<br />

DEPARTMENT<br />

HSE Manager<br />

Sr. HSE Engineers<br />

HSE Engineers<br />

Sr. Safety Officers<br />

Safety Officers<br />

Male Nurse<br />

QA/QC<br />

DEPARTMENT<br />

QA/QC Manager<br />

QA/QC Engineers<br />

QA/QC Inspectors<br />

QHSE Secretary


10<br />

<strong>Company</strong> Manpower Chart<br />

<strong>Lindenberg</strong> has got sufficient manpower, including Chartered Engineers, Certified Accountants,<br />

Certified Electrical and Civil Discipline Technicians to participate and execute Mega Projects with<br />

utmost professionalism and to the satisfaction of our Clients.<br />

Staff Category (Total: 256) Skilled & Unskilled Workers (Total: 801)<br />

QA/QC<br />

Engineers, 4<br />

Planning & Cost<br />

Control, 4<br />

Engineers - All<br />

Discipline, 62<br />

Foreman &<br />

Supervisors, 46<br />

Draftsman - All<br />

Discipline, 9<br />

Doc Controllers, 7<br />

Coordinators, 6<br />

Officers & Legal<br />

Advisors, 6<br />

Administrators, 6<br />

Project Managers /<br />

Dept. Heads, 29<br />

Storekeepers /<br />

Timekeepers, 10<br />

Office Assistants, 17<br />

Safety Officers, 12<br />

Secretaries, 14<br />

Accountants, 11<br />

Land<br />

Surveyors, 13<br />

Laborers, 293<br />

Painters, 6<br />

Mechanics, 9<br />

Welders, 12<br />

Pipe Fitters, 19<br />

Carpenters, 119<br />

Charged Hands, 27<br />

Masons, 68<br />

Operators, 46<br />

Cleaners / Office Boy,<br />

30<br />

Electrician, 66<br />

Steel Fixers, 59<br />

Drivers - All Discipline,<br />

47<br />

Data as of Dec-2011


11<br />

Registration / Clients List<br />

<strong>Lindenberg</strong> is registered / pre-qualified or have submitted tender with the following companies /<br />

government agencies:<br />

1. Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

2. Abu Dhabi Future Energy <strong>Company</strong><br />

(MASDAR)<br />

3. Abu Dhabi Gas Industries Ltd. (GASCO)<br />

4. Abu Dhabi Health Services Co. PJSC (SEHA)<br />

5. Abu Dhabi Marine Operating <strong>Company</strong><br />

(ADMA-OPCO)<br />

6. Abu Dhabi Ministry of Defense – Military<br />

Works Department<br />

7. Abu Dhabi National Oil <strong>Company</strong> (ADNOC)<br />

8. Abu Dhabi Oil Refining <strong>Company</strong> (TAKREER)<br />

9. Abu Dhabi Police General Head Quarters<br />

10. Abu Dhabi Polymers Co. Ltd. (Borouge)<br />

11. Abu Dhabi Sewerage Services <strong>Company</strong><br />

(ADSSC)<br />

12. Abu Dhabi Transmission & Despatch<br />

<strong>Company</strong> (TRANSCO)<br />

13. Abu Dhabi Water & Electricity Authority<br />

(ADWEA)<br />

14. Al Ain Distribution <strong>Company</strong> (AADC)<br />

1 2 3 4 5 6<br />

7 8 9 10 11 12<br />

13 14 15 16 17 18<br />

19 20 21 22 23 24<br />

15. ALDAR Properties PJSC 20. Municipality of Abu Dhabi<br />

16. Dubai Electricity & Water Authority (DEWA) 21. National Central Cooling Co. PJSC (TABREED)<br />

17. Federal Electricity & Water Authority (FEWA) 22. Sultanate of Oman – Public Authority for Electricity and Water<br />

18. International Petroleum Investment Co. (IPIC) 23. Tourism Development & Investment <strong>Company</strong> (TDIC)<br />

19. Mubadala Development <strong>Company</strong> 24. UAE Armed Forces – Special Operations Command


12<br />

Registration / Clients List<br />

<strong>Lindenberg</strong> is highly experienced working with the following Project Consultants:<br />

1. Deutsche Energie Consult GmbH (DECON)<br />

2. Dorsch Consult<br />

3. Dr. M. H. Ali El-Saie Consulting Engineers<br />

4. Hyder Consulting Middle East Limited<br />

5. ILF Consulting Engineers<br />

6. Italconsult<br />

7. Lahmeyer International GmbH<br />

8. Mott Macdonald<br />

9. Ozen Levent Power Engineering<br />

Consultancy LLC<br />

10. Parsons Brinckerhoff Power<br />

11. Parsons International Ltd.<br />

12. Tebodin Consultants & Engineers<br />

1 2 3 4<br />

5 6 7 8<br />

9 10 11 12


13<br />

<strong>Lindenberg</strong> was Prequalified & Tendered for ADSSC’s STEP Project:<br />

1. <strong>Lindenberg</strong> <strong>Emirates</strong> was one of the 5<br />

prequalified companies for the Sewerage<br />

Tunnel Enhancement Project “STEP Project”<br />

comprising of a 45 km tunnel of 5-meter<br />

diameter at a depth of 40-45 meters which is<br />

expected to be worth of AED 3 Billion. For<br />

this tender, <strong>Lindenberg</strong> formed a consortium<br />

with Major Korean Construction Companies.<br />

2. Tender No. O-1506, STEP Deep Tunnel Sewer<br />

Contract T-02.<br />

3. Tender No. O-1578, STEP Deep Tunnel Sewer<br />

Contract T-03.


14<br />

<strong>Company</strong> Classification at Abu Dhabi Department of Planning & Economy<br />

SN Field Scope of Works Category<br />

1. WATER PROJECTS<br />

2. ELECTRICAL PROJECTS<br />

3. SEWERAGE PROJECTS<br />

4.<br />

1. Water Transport Plants & Networks<br />

2. Water Distribution Plants & Networks<br />

1. Power Distribution Networks & Plants<br />

2. Communications Networks<br />

1. Main Sewerage Networks<br />

2. Sewerage Sub-Networks & House Connections<br />

MECHANICAL & ELECTRICAL<br />

WORKS PROJECTS 1. Mechanical and Electrical Works 5 th<br />

5. BUILDING PROJECTS<br />

1. All types of Buildings<br />

2. Metallic Constructions<br />

1 st<br />

1 st<br />

2 nd<br />

5 th<br />

5 th<br />

5 th<br />

5 th<br />

5 th


15<br />

Selected Power & Civil Projects<br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

R-99-0157<br />

G-6334<br />

G-1882<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery<br />

Energy Storage (42MW)<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals (Stage-III Phase-III)<br />

ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed<br />

ADWEA AED 142,271,120 23.11.2009 DECON Ongoing<br />

ADWEA AED 103,122,825 07.08.2005<br />

Lahmeyer<br />

International GmbH<br />

Completed<br />

D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing<br />

D-7150<br />

D-10624<br />

115979C13E<br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace<br />

in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu<br />

Dhabi Island<br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical<br />

Equipment – Low Voltage (LV) Panels Switchgear<br />

- Shuweihat S3 IPP Civil Work Package 3<br />

G-1494<br />

D-10599<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals, Stage-III Phase-III, Lot-1<br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi<br />

Island & Eastern Region<br />

ADDC AED 40,667,381 05.05.2008<br />

Ozen Levent<br />

Power Engineering<br />

Consultancy LLC<br />

Completed<br />

ADDC AED 34,028,598 25.05.2010 DECON Ongoing<br />

ADNOC AED 29,675,361 23.04.2009 - Completed<br />

Daewoo<br />

E&C<br />

AED 29,191,474 27.07.2011<br />

ADWEA AED 25,914,216 05.02.2003<br />

Fichtner Consulting<br />

Engineers<br />

Lahmeyer<br />

International GmbH<br />

Ongoing<br />

Completed<br />

ADDC AED 19,683,403 10.02.2010 DECON Completed<br />

D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed<br />

4600037153<br />

Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power<br />

Plant<br />

Hyundai E&C AED 16,865,843 27.07.2011 - Ongoing


16<br />

Selected Water & Drainage Projects<br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

N-5807<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /<br />

Abu Dhabi Island<br />

TRANSCO AED 569,594,995 20.01.2008<br />

D-10924 Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan ADDC AED 179,999,340 08-01-2012<br />

N-6821<br />

O-1463<br />

EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating<br />

Reservoir Station – Lot D<br />

Works Associated with the Replacement of Existing Sewer Networks at Some<br />

Sectors Inside Abu Dhabi Island - Category A<br />

TRANSCO AED 174,524,364 07.03.2010<br />

Tebodin Consultants<br />

and Engineers<br />

Tebodin Consultants<br />

and Engineers<br />

ILF Consulting<br />

Engineers<br />

Ongoing<br />

Ongoing<br />

Ongoing<br />

ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing<br />

N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007<br />

Tebodin Consultants &<br />

Engineers<br />

Completed<br />

D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed<br />

O-10841<br />

CW/119C/<br />

2007<br />

11 D-5630<br />

Construction of Sewerage Connections and Related Works in Abu Dhabi Island<br />

and Main Land - Phase VII<br />

Supply, Installation, Testing and Commissioning of Fiber Cement / Glass<br />

Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated<br />

Works at Various Locations in <strong>Emirates</strong> of Dubai (1200 mm Dia Pipeline Along<br />

<strong>Emirates</strong> Road)<br />

ADSSC AED 80,000,000 29-Mar-2012<br />

DEWA AED 73,794,659 08-Jul-2007<br />

N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008<br />

AECOM Middle East<br />

Ltd.<br />

NJS Consultants<br />

Co. Ltd.<br />

Tebodin Consultants<br />

and Engineers<br />

Ongoing<br />

Completed<br />

Completed<br />

N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed<br />

Urgent Works at Al Qadra Village Owned by<br />

HH Sheikh Mansour Bin Zayed<br />

ADWEA AED 16,877,777 15.04.2006 Italconsult Completed<br />

12 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed


17<br />

Division <strong>Profile</strong><br />

<strong>Lindenberg</strong> Power Division provides expertise in implementing Electromechanical and<br />

Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and<br />

commissioning and maintenance services for diverse industrial projects.<br />

Having the expertise in turnkey contracting on many projects, the Power Division is very familiar<br />

with all criteria necessary for the successful execution of Electromechanical projects. The Power<br />

Division builds these mandatory requirements into all projects:<br />

� Reliable and efficient performance<br />

� Single-point responsibility<br />

� ISO-certified quality control procedures<br />

� Proven safety programs<br />

� Cost controls and reductions<br />

� Productive and on-time scheduling


18<br />

Division <strong>Profile</strong><br />

The Power Division provides a dedicated technical and managerial team necessary to design and<br />

construct new facilities or upgrades. By bringing together every aspect of a power project under a<br />

single management team, the division provides economical and efficient solutions to meet the needs<br />

of a diverse industry base.<br />

The project management team comprised of specialists in the design, construction and operation of<br />

complex type of projects. From concept through acceptance, the division provides the optimal<br />

resources, equipment and services to meet all contractual requirements. The EPC team is<br />

accountable for the following critical functions:<br />

� Planning, organizing and procedures<br />

� Scheduling and tracking<br />

� Cost control<br />

� Document control<br />

� Single-point customer contact<br />

� Progress reporting


19<br />

Scope of Activities<br />

� Contracting works for Power Networks and Distribution Systems<br />

� Underground cable network including jointing, termination, testing and commissioning<br />

� Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations,<br />

Desalination Plants and Sewerage Treatment Plants<br />

� Turnkey contracting works for LV / MV / HV Substations<br />

� EPC works for electric generators<br />

� Installation and commissioning of auxiliary powers, package substation, control panels and<br />

transmission lines<br />

� Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire<br />

suppression systems.<br />

� Control / MCC room fire suppression systems installation<br />

� Submarine Cable Installation<br />

� Industrial Building Construction<br />

� HVAC Works<br />

� LV / MV / HV Switchgear and Transformer Installation<br />

� Installation and Commissioning of Auxiliary Power Supplies


20<br />

Typical Power Project Organization Chart<br />

ENGINEERING<br />

Civil Engineer<br />

Electrical Engineer<br />

PLANNING & QS<br />

Planning Engineer<br />

Quantity Surveyor<br />

Mechanical Engineer Site Civil Engineer<br />

Mechanical Foreman<br />

HEAD OF POWER DIVISION<br />

PROJECT MANAGER<br />

CONSTRUCTION<br />

Construction Manager /<br />

Project Engineer<br />

HSE & QA/QC<br />

HSE Engineer<br />

QA/QC Engineer<br />

Site Electrical Engineer Testing & Comm. Eng.<br />

Civil Foreman Electrical Foreman Draftsmen<br />

OFFICE SUPPORT<br />

Design Coordinator<br />

Coordinator<br />

Secretary<br />

Doc. Controller<br />

Storekeeper<br />

Timekeeper<br />

Watchman


21<br />

Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

Contract No. R-99-0157<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 176,957,025<br />

Award Date 08-Feb-2000<br />

Description Supply, Installation, Testing & Commissioning Works<br />

Project was completed.


22<br />

Featured Projects<br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery<br />

Energy Storage (42MW)<br />

Contract No. G-6334<br />

Client Abu Dhabi Water and Electricity Authority (ADWEA)<br />

Value AED 142,271,120<br />

Award Date 23-Nov-2009<br />

Description Design & Construction of 10 Nos. BESS Substation & Installation Testing<br />

Commissioning of NGK Batteries & Supply of Auxiliary Items.


23<br />

Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces & Hospitals (Stage-III Phase-III)<br />

Contract No. G-1882<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 103,122,825<br />

Award Date 07-Aug-2005<br />

Description Design, Supply, Installation Testing and Commissioning including remote<br />

control monitoring system, ISMS, and Medium Voltage Panels.<br />

Project was completed in May 2010.


24<br />

Featured Projects<br />

Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations<br />

Contract No. D-6990<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 81,991,962<br />

Award Date 03-Jan-2010<br />

Description Design & Construction of 1 New 132/11 kV Substation & Modification of<br />

11 kV Network and Replacement with new 11 kV Switchgear @ 2 nos.<br />

Substation.


25<br />

Featured Projects<br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu<br />

Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

Contract No. D-7150<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 40,667,381<br />

Award Date 05-May-2008<br />

Description Design, Supply, Installation Testing and Commissioning of 11KV<br />

Switching Station & replacement of Switchgears, Control Panels, DC<br />

system in Beach Palace Stations B4, B5 Stations & Standby power plant<br />

in H.H.Shk Khalifa Switching station. Completed in July 2010.


26<br />

Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals Stage-III Phase-III. Lot-1<br />

Contract No. G-1494<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 25,914,216<br />

Award Date 05-Feb-2003<br />

Description Design, Supply, Installation Testing and Commissioning Works<br />

Project was completed.


27<br />

Featured Projects<br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island &<br />

Eastern Region (2010)<br />

Contract No. D-10599<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 19,683,403<br />

Award Date 10-Feb-2010<br />

Description Installation of Underground 11 kV Cables of 112 km & FO Cables of 20<br />

km.


28<br />

Featured Projects<br />

Supply and Installation of 8 Nos. 415 Volts Diesel Generators<br />

Contract No. G-1206<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 13,039,984<br />

Award Date 10-Apr-2002<br />

Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415<br />

Volts Diesel Generators.


29<br />

Featured Projects<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island<br />

Contract No. D-10624<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 34,028,598<br />

Award Date 25-May-2010<br />

Description Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.<br />

Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.<br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear<br />

Contract No. 115979C13E<br />

Client Abu Dhabi National Oil <strong>Company</strong> (ADNOC)<br />

Value AED 29,675,361<br />

Award Date 23-Apr-2009<br />

Description Supply & Delivery of Low Voltage Panels Switchgear.


30<br />

Featured Projects<br />

Shuweihat S3 IPP Civil Work Package 3<br />

Client Daewoo E&C-Siemens (Consortium)<br />

Value AED 29,191,475<br />

Award Date 20-Jul-2011<br />

Description Civil works which includes excavation, filling, concreting, finishing, waterproofing, structural steel works, etc. for<br />

fuel gas pipelines with sleeper foundations & trenches, storm drain works and site roads with asphalt.<br />

Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant<br />

Contract No. 4600037153<br />

Client Hyundai Engineering & Construction<br />

Value AED 16,865,843<br />

Award Date 27-Jul-2011<br />

Description Commissioning of 18 Nos. 11 kV Package Substations.


31<br />

Featured Projects<br />

Modification of Switching Stations in Abu Dhabi Island<br />

Contract No. D-7720<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 16,999,999<br />

Award Date 06-Aug-2008<br />

Description Supply, Installation & Commissioning of RMU’s and Modification of<br />

Transformer Panel to Feeder Panel in Switching Stations.<br />

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu<br />

Dhabi Eastern Region<br />

Contract No. D-9710/C<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 10,000,000 per year<br />

Award Date 16-Apr-2009<br />

Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order<br />

Basis.


32<br />

Featured Projects<br />

Transfer of 11kV Load to New 132/11kV W02 Primary Substation in Abu Dhabi Island<br />

Contract No. D-11915<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 13,603,107<br />

Award Date 23-Oct-2011<br />

Description Excavation and 11 kV cable laying works in Central Market Area, in order to transfer 11 kV load to new 132/11 kV<br />

W02 Primary Substation.<br />

Installation of 22 kV Cables from 132/22 kVA - A Beach Primary to Masdar City<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 2,121,525.65<br />

Award Date 15-Sep-2011<br />

Description Installation & commissioning of 22 kV power cables with 144 fiber optic cables to provide the power supply to the<br />

initial demand for Masdar City Development.


33<br />

Power Stations<br />

Power Station with Diesel Engine for operation<br />

on Diesel, Crude Oil and HFO<br />

Power Station with Gas Engines Power Station with Dual Fuel Engines<br />

Turnkey Power Stations up to 12 MW<br />

Powered with Diesel, Gas and Dual Fuel Engines


34<br />

Division <strong>Profile</strong><br />

In order to accommodate the brisk developments of UAE’s industry, <strong>Lindenberg</strong> Water and Drainage<br />

Division was established to provide water and drainage solutions.<br />

The Division has up-to-date working knowledge of and is very well conversant with the requirements<br />

in water supply and water distribution network. The necessary infrastructure, including manpower,<br />

reliable sources of suppliers, equipment are readily available at our disposal.


35<br />

Division <strong>Profile</strong><br />

The Water & Drainage Division is acknowledged as the premier provider of the highest quality<br />

professional service in the field of water and drainage facilities; insuring absolute client satisfaction<br />

through the expertise and experience of its people. The division aims to provide new technologies,<br />

processes, and materials to build and deliver water and drainage facilities that are best suitable for<br />

their class & area of usage.<br />

Scope of Activities<br />

� Water Pipeline Networks<br />

� Water & Irrigation Reservoirs<br />

� Water & Sewerage Pumping Stations<br />

� Sewage Treatment Plants<br />

� Operation & Maintenance of Sewerage<br />

Networks and Pumping Stations


36<br />

Typical Water & Drainage Project Organization Chart<br />

ENGINEERING<br />

Civil Engineer<br />

Electromech’l Engineer<br />

Inst & Ctrl. Engineer<br />

Water Tank Works<br />

(Concrete Construction)<br />

PLANNING & QS<br />

Planning Engineer<br />

Quantity Surveyor<br />

DIVISION MANAGER<br />

PROJECT MANAGER<br />

CONSTRUCTION<br />

Construction Manager /<br />

Project Engineer<br />

HSE Engineer<br />

QA/QC Engineer<br />

Site Engineer Site Engineer Site Engineer<br />

OFFICE SUPPORT<br />

Coordinator<br />

Secretary<br />

Doc. Controller<br />

Draftsman<br />

Storekeeper<br />

Timekeeper<br />

Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works<br />

Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew<br />

Civil Work Crew Pipeline Crew Chamber Crew<br />

HSE & QA/QC<br />

Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman


37<br />

Featured Projects<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi<br />

Island<br />

Contract No. N-5807<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 569,594,995<br />

Award Date 20-Jan-2008<br />

Description Construction of DI/CS Pipelines


38<br />

Featured Projects<br />

Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan<br />

Contract No. D-10924<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 179,999,340<br />

Award Date 08-Jan-2012<br />

Description Construction of 65 km DN 400~500 DI Pipelines, 2 x 0.5 Million Gallons<br />

Storage Steel Tanks and Pump Station of 7 Million Gallons per day<br />

capacity.


39<br />

Featured Projects<br />

EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir<br />

Station - Lot D<br />

Contract No. N-6821<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 174,524,364<br />

Award Date 07-Mar-2010<br />

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and<br />

Pipeline Works.


40<br />

Featured Projects<br />

Works Associated with the Replacement of Existing Sewer Networks at Some Sectors<br />

Inside Abu Dhabi Island - Category A<br />

Contract No. O-1463<br />

Client Abu Dhabi Sewerage Services <strong>Company</strong> (ADSSC)<br />

Value AED 116,026,699<br />

Award Date 13-Jun-2010<br />

Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and<br />

Manholes Inside Abu Dhabi Island.


41<br />

Featured Projects<br />

Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C<br />

Contract No. N-2622.1<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 108,118,493<br />

Award Date 22-Jul-2007<br />

Description Supply, Construction, & Installation of Water Supply Network<br />

The Project was completed in June 2009


42<br />

Featured Projects<br />

Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway<br />

Contract No. D-7310.1<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 94,037,448<br />

Award Date 22-May-2008<br />

Description Supply and Replacement of Water Transmission Pipelines<br />

The Project was completed in November 2010


43<br />

Featured Projects<br />

Water Transmission Lines Inside Al Reem Island – Lot A<br />

Contract No. N-5386<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 56,455,067<br />

Award Date 03-Feb-2008<br />

Description Installation of DI/CS Pipelines<br />

The Project was completed in January 2010


44<br />

Featured Projects<br />

DN 1000mm Transmission Pipeline from Sweihan to Remah<br />

Contract No. N-4604<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 25,889,764<br />

Award Date 23-Jul-2007<br />

Description Supply, Construction, and Installation of Water Transmission Pipelines<br />

The Project was completed in June 2009


45<br />

Featured Projects<br />

Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed<br />

Contract No. D-5630<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 16,877,777<br />

Award Date 15-Apr-2006<br />

Description Supply, Construction & Maintain Water Supply Network<br />

The Project was completed in July 2008


46<br />

Featured Projects<br />

Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)<br />

Contract No. O-1047<br />

Client Abu Dhabi Sewerage Services <strong>Company</strong> (ADSSC)<br />

Value AED 10,400,000<br />

Award Date 30-Jan-2008<br />

Description Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash<br />

Shuhaib<br />

The Project was completed in July 2009


47<br />

QHSE Policy<br />

LINDENBERG implements and maintains an effective QHSE Management System in line with the<br />

requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007.<br />

It is our policy to<br />

� Meet or exceed our clients' expectations, the first time and every time, through the application of<br />

proven quality principles at all levels of our business;<br />

� Minimize the generation of hazardous & toxic waste, preventing the release of harmful substances<br />

into the environment, while encouraging the reduction, recycling and re-use of materials;<br />

� Instilling and promoting safety consciousness to prevent ill health, injury and incidents; and provide a<br />

safe and healthy working environment for our employees, clients, and subcontractors.<br />

We are committed to<br />

� Ensuring that adequate resources are made available for QHSE purposes.<br />

� Ensuring that QHSE is accepted as a core management activity, given equal priority as other<br />

objectives and management functions, and included in the company business plan.<br />

� Promoting a positive QHSE culture within the top management and encouraging active employee<br />

participation in QHSE throughout all levels of the company.<br />

LE-IMS-Pol | rev. 1<br />

AHMAD ZAABRI<br />

General Manager


48<br />

QHSE Certificates & Membership<br />

<strong>Lindenberg</strong> <strong>Emirates</strong> is an Integrated Management System (IMS) certified company and has<br />

established, implemented and maintained an effective Quality, Occupational Health & Safety and<br />

Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004<br />

and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met.<br />

ISO 9001:2008<br />

ISO 14001:2004<br />

OHSAS 18001:2007<br />

British Safety Council


49<br />

Workforce and Labour Camp<br />

<strong>Lindenberg</strong>-<strong>Emirates</strong> LLC employs almost 800 Skilled and Unskilled Labors. Labor Camps with all<br />

modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of<br />

the health & safety of the workforce.<br />

Camp Location Size No. of Rooms<br />

Al Faya 1,300 m 2<br />

Magenta Camp (rented)<br />

Al Ain 400 m 2<br />

Current No. of<br />

Occupants<br />

96 600<br />

46 264<br />

28 45<br />

Data as of 10-Oct-2011


50<br />

Store Facilities<br />

Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m 2 are operational at Mussafah to<br />

help in storing & preserving the materials received for different projects, also used for storage of our<br />

standard erection tools required during installation/ commissioning activities.


51<br />

Plant, Machineries, Vehicles and Equipment<br />

<strong>Lindenberg</strong> <strong>Emirates</strong>’ policy in Vehicles, Equipment and Machinery is to:<br />

� purchase and own all equipment to cover the project needs.<br />

� self-maintain these vehicles, equipment and machinery.<br />

� hire vehicles, equipment and machinery to prevent delays in the project execution.


52<br />

Contact Information<br />

We hope that the information given and detailed in this <strong>Company</strong> <strong>Profile</strong> is sufficient to illustrate the<br />

potential and capabilities of <strong>Lindenberg</strong>. We will be pleased to provide further information on your<br />

request. Kindly contact us.<br />

<strong>Lindenberg</strong> <strong>Emirates</strong> LLC <strong>Lindenberg</strong> Water & Drainage Division<br />

Villa 101, Al Nahyan Camp Area, (A Division of <strong>Lindenberg</strong> <strong>Emirates</strong> LLC)<br />

Muroor Road, P.O. Box 42630, Tel: +971 2 642 2576<br />

Abu Dhabi, United Arab <strong>Emirates</strong> Fax: +971 2 642 2579<br />

Tel: +971 2 642 2576 E-mail: lwd@lindenberg.ae<br />

Fax: +971 2 642 2591<br />

E-mail: info@lindenberg.ae <strong>Lindenberg</strong> Power Division<br />

Website: www.lindenberg.ae (A Division of <strong>Lindenberg</strong> <strong>Emirates</strong> LLC)<br />

Tel: +971 2 642 2576<br />

Fax: +971 2 642 2571<br />

E-mail: lpd@lindenberg.ae


P.O. Box 42630, Abu Dhabi, United Arab <strong>Emirates</strong><br />

Tel: +971 2 6811061, Fax: +971 2 6813655<br />

E-mail: info@lindenberg.ae<br />

Website: www.lindenberg.ae