Selected Water & Drainage Projects<br />
SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
N-5807<br />
Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /<br />
Abu Dhabi Island<br />
TRANSCO AED 569,594,995 20.01.2008<br />
D-10924 Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan ADDC AED 179,999,340 08-01-2012<br />
N-6821<br />
O-1463<br />
EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating<br />
Reservoir Station – Lot D<br />
Works Associated with the Replacement of Existing Sewer Networks at Some<br />
Sectors Inside Abu Dhabi Island - Category A<br />
TRANSCO AED 174,524,364 07.03.2010<br />
Tebodin Consultants<br />
and Engineers<br />
Tebodin Consultants<br />
and Engineers<br />
ILF Consulting<br />
Engineers<br />
Ongoing<br />
Ongoing<br />
Ongoing<br />
ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing<br />
N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007<br />
Tebodin Consultants &<br />
Engineers<br />
Completed<br />
D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed<br />
O-10841<br />
CW/119C/<br />
2007<br />
11 D-5630<br />
Construction of Sewerage Connections and Related Works in Abu Dhabi Island<br />
and Main Land - Phase VII<br />
Supply, Installation, Testing and Commissioning of Fiber Cement / Glass<br />
Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated<br />
Works at Various Locations in <strong>Emirates</strong> of Dubai (1200 mm Dia Pipeline Along<br />
<strong>Emirates</strong> Road)<br />
ADSSC AED 80,000,000 29-Mar-2012<br />
DEWA AED 73,794,659 08-Jul-2007<br />
N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008<br />
AECOM Middle East<br />
Ltd.<br />
NJS Consultants<br />
Co. Ltd.<br />
Tebodin Consultants<br />
and Engineers<br />
Ongoing<br />
Completed<br />
Completed<br />
N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed<br />
Urgent Works at Al Qadra Village Owned by<br />
HH Sheikh Mansour Bin Zayed<br />
ADWEA AED 16,877,777 15.04.2006 Italconsult Completed<br />
12 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed