Selected Water & Drainage Projects<br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

N-5807<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /<br />

Abu Dhabi Island<br />

TRANSCO AED 569,594,995 20.01.2008<br />

D-10924 Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan ADDC AED 179,999,340 08-01-2012<br />

N-6821<br />

O-1463<br />

EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating<br />

Reservoir Station – Lot D<br />

Works Associated with the Replacement of Existing Sewer Networks at Some<br />

Sectors Inside Abu Dhabi Island - Category A<br />

TRANSCO AED 174,524,364 07.03.2010<br />

Tebodin Consultants<br />

and Engineers<br />

Tebodin Consultants<br />

and Engineers<br />

ILF Consulting<br />

Engineers<br />

Ongoing<br />

Ongoing<br />

Ongoing<br />

ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing<br />

N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007<br />

Tebodin Consultants &<br />

Engineers<br />

Completed<br />

D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed<br />

O-10841<br />

CW/119C/<br />

2007<br />

11 D-5630<br />

Construction of Sewerage Connections and Related Works in Abu Dhabi Island<br />

and Main Land - Phase VII<br />

Supply, Installation, Testing and Commissioning of Fiber Cement / Glass<br />

Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated<br />

Works at Various Locations in <strong>Emirates</strong> of Dubai (1200 mm Dia Pipeline Along<br />

<strong>Emirates</strong> Road)<br />

ADSSC AED 80,000,000 29-Mar-2012<br />

DEWA AED 73,794,659 08-Jul-2007<br />

N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008<br />

AECOM Middle East<br />

Ltd.<br />

NJS Consultants<br />

Co. Ltd.<br />

Tebodin Consultants<br />

and Engineers<br />

Ongoing<br />

Completed<br />

Completed<br />

N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed<br />

Urgent Works at Al Qadra Village Owned by<br />

HH Sheikh Mansour Bin Zayed<br />

ADWEA AED 16,877,777 15.04.2006 Italconsult Completed<br />

12 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed