12.07.2015 Views

Proposed Power Development Plan (PDP) 2012 - Palang Thai

Proposed Power Development Plan (PDP) 2012 - Palang Thai

Proposed Power Development Plan (PDP) 2012 - Palang Thai

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Proposed</strong> <strong>Power</strong> <strong>Development</strong> <strong>Plan</strong> (<strong>PDP</strong>) <strong>2012</strong>and a Framework for Improving Accountability and Performance of <strong>Power</strong> Sector <strong>Plan</strong>ning<strong>PDP</strong> 2010 <strong>PDP</strong> <strong>2012</strong>Project (MW)Capacity already online since 2010(as of Oct 2011)Year Installed(MW)Project (MW)Capacity already online since 2010(as of Oct 2011)YearInstalled(MW)ReserveMarginNam Theun 2North Bangkok CC # 1Nam Ngum 2Additions of capacityconsidered “clean” or in thepipelineSPP – cogenerationSPP – renewablesVSPPEGAT renewablesGheco One (IPP)Theun Hinboun ExpansionWang Noi CC#4 (EGAT)Bang Lang Dam ExpansionLam Ta Kong (pump storage)Other capacity additionsGas CC 17 unitsCoal 13 unitsHydro (imports)Lignite (imports)Nuclear 5 units9206705977,3401,0452,5673366602208001250013,47915,2007,7408,0901,8425,00037,872200920102011<strong>2012</strong>20132014201520162017201820192020202120222023202420252026202720282029203029,21231,34932,99234,17137,00239,72039,99041,41942,37442,61944,29044,84347,61848,98251,23552,53352,73856,95756,83061,35563,82465,547Nam Theun 2North Bangkok CC # 1Nam Ngum 2Additions of capacity alreadyincluded in <strong>PDP</strong> 2010SPP – cogenerationSPP – renewablesVSPPEGAT renewablesGheco One (IPP)Theun Hinboun ExpansionWang Noi CC#4 (EGAT)Bang Lang Dam ExpansionLam Ta Kong (pump storage)Other resource additionsEE/DSMCogeneration<strong>Plan</strong>t life extension(retiring after 2030)*9206705977,3401,0452,5673366602208001250013,4799,9234,8003,10417,827200920102011<strong>2012</strong>20132014201520162017201820192020202120222023202420252026202720282029203029,21231,35032,99333,40333,45732,51332,75733,43834,25334,66235,23236,62637,30137,56537,22637,21536,42837,14737,96136,52737,89635,57927.6%26.7%33.9%31.0%27.6%20.9%19.2%19.3%20.2%19.7%20.2%23.3%24.3%23.9%21.8%20.9%18.0%20.1%22.7%18.1%23.7%15.9%Generation capacity as of December 2009 29,212Total capacity added during 2010 – 2030 54,005Total capacity decommissioned during -17,6712010-2030Total capacity at the end of 2030 65,547*Additional 12,543 MW was extended but retired by 2030**Excluding savings from EE/DSMGeneration capacity as of December 2009 29,212Total capacity added during 2010 – 2030 20,934Total capacity decommissioned during 2010-2030 -14,567Total capacity at the end of 2030 35,579(Excluding 10,158 MW savings from EE/DSM)Table 15: Comparison of resource additions through year 2030 in <strong>PDP</strong> 2010 vs. <strong>PDP</strong> <strong>2012</strong>Details of the <strong>PDP</strong> <strong>2012</strong> are summarized in Table 15. The <strong>PDP</strong> <strong>2012</strong> analysis finds that 55 power plant projects ofvarious types (nuclear, coal, gas CC, hydro imports and lignite-fired imports) included in the <strong>PDP</strong> 2010 areunnecessary to maintain the reliability of the system (15% minimum reserve margin). These projects are removedfrom the lineup in the <strong>PDP</strong> <strong>2012</strong> (Table 16).28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!