12.07.2015 Views

Guidance on DNV's DRILL notation

Guidance on DNV's DRILL notation

Guidance on DNV's DRILL notation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OFFSHORE TECHNICAL GUIDANCEAnnualDrilling relatedstructuresComplete periodical• Visual inspecti<strong>on</strong> primaryload path members includinglifting eyes/pad eyes.Liftingarrangements forequipment• Spot-check NDT <strong>on</strong> main structural welds as deemedappropriate.• Load test as requiredWell c<strong>on</strong>trol systemsAnnual Well c<strong>on</strong>trol Complete periodical• Review of records ofmaintenance (e.g. pressuretest results, NDT reports,repair work);• Review records for functi<strong>on</strong>testing of the BOP using theaccumulators mounted <strong>on</strong> theBOP Stack;• Review records for functi<strong>on</strong>testing of the fail-safe valvesin the Choke & Kill linesmounted <strong>on</strong> the BOP.BOP stack*/General* incl. hydraulic hoses,shuttle valves, highpressure panels, etc.• Such major comp<strong>on</strong>ents will normally have the majoroverhauls carried out during the complete periodicalsurvey. C<strong>on</strong>firmati<strong>on</strong> of recent major overhaul ofBOP comp<strong>on</strong>ents in presence of a DNV Surveyor tobe reviewed;• Complete functi<strong>on</strong> testing of the BOP-stack includingall preventers, c<strong>on</strong>nectors and fail-safe valves (usingthe accumulator system, not <strong>on</strong>ly the stack mountedaccumulators);• Leak/pressure test to dem<strong>on</strong>strate satisfactoryfuncti<strong>on</strong> of rams, annular elements, valve gates, C/Kc<strong>on</strong>necti<strong>on</strong>s;• Testing should be carried out at low pressure (approx.200-300 psi) and then at max rated working pressure.(Note: For testing of the pipe rams and annularelement a suitable test tool should be used, suitablyanchored to the test stump);• MPI of all load bearing welds <strong>on</strong> the BOP guideframe;• Survey of BOP stack structural frame checkingevidence of excessive corrosi<strong>on</strong> or damage.DET NORSKE VERITASAppendix AOTG-07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!