12.07.2015 Views

Guidance on DNV's DRILL notation

Guidance on DNV's DRILL notation

Guidance on DNV's DRILL notation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OFFSHORE TECHNICAL GUIDANCEPerformance testPressure testOverhaul: Testing of the intended functi<strong>on</strong>ing of a comp<strong>on</strong>ent. Low pressure as well as ratedworking pressure is required. Operators to be tested as well as the main functi<strong>on</strong> itself.: Test, usually hydrostatic but may involve other fluids or gas, to test pressures as per therelevant standards.: Process of restoring and maintaining an equipment, machine, or system in a serviceablec<strong>on</strong>diti<strong>on</strong>. Overhaul involves (1) partial or complete disassembly of the item, (2)inspecti<strong>on</strong> to detect damaged, defective, or worn parts, (3) repair or replacement ofsuch parts, and (4) reassembly, testing, and trial-run prior to returning the item to its fulloperating level. Overhaul does not involve modificati<strong>on</strong>s to the original design.Over-pressure test : also referred to as proof test. With the comp<strong>on</strong>ent completely assembled but notpainted, and internal mechanisms in open positi<strong>on</strong> as applicable, all outlets should beblanked off. The comp<strong>on</strong>ent should then be pressurized to a test pressure asdetermined by the relevant design code, or as specially agreed.RefurbishmentRe-manufacturing: See definiti<strong>on</strong> of overhaul: Total or partial dismantling and weld, repair and/or stress relieving heat treatment, e.g.after rewelding ring grooves, bores etc. of pressure c<strong>on</strong>taining comp<strong>on</strong>ents. Gates ingate valves, flaps in n<strong>on</strong>-return valves, rams in ram type BOP's, annular preventer bagelements or other sealing elements that moves. Pressure energized sealing such as ringgaskets are not classed as dynamic seals.Abbreviati<strong>on</strong>sCVI Close Visual Inspecti<strong>on</strong>DPIIIPLPIMPIMWPNDTPWHTUPSPSVROVIBOPWPDye Penetrant Inspecti<strong>on</strong>In-service Inspecti<strong>on</strong> program. A DNV developed inspecti<strong>on</strong> plan c<strong>on</strong>taining the structural items to besurveyed to satisfy the requirements of main class, excluding any additi<strong>on</strong>al class notati<strong>on</strong>s (note forcolumn stabilized and self-elevating units <strong>on</strong>ly)Liquid Penetrant Inspecti<strong>on</strong> (also known as DPI)Magnetic Particle Inspecti<strong>on</strong>Maximum Work Pressure (maximum pressure for which item is designed)N<strong>on</strong> Destructive TestingPost Weld Heat TreatmentUninterrupted Power SupplyPressure Safety ValveRemote Operated VehicleInternal Blow Out PreventerWorking PressureOther definiti<strong>on</strong>s and abbreviati<strong>on</strong>s can be found in Ch. 1 Sec. 1 of both OSS-101 and OS-E101.DET NORSKE VERITASPage 4OTG-07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!