MCB CAMP PENDLETON22/23 AREA GROUNDWATERWELL SITING STUDY(CHAPPO SUBBASIN)S 17 January 2013109 th FFA Meeting{}CHAPPO SUBBASIN INVESTIGATIONUpdate: December 5, 2012 – Sent Final Sampling andAnalysis Plan to FFA Team December 3, 2012 - Briefed OWR on the IR Program,this IR Site, and the New Well December 28, 2012 - Sampled Well CH-5A‣ HydraSleeves for 1,2,3,-TCP – Preliminary Results ND.‣ Passive Diffusion Bags (PDBs) placed to sample for all otherVOCs (will return to collect samples January 18, 2013). January 21 – Planned start date for drilling and well{} installation2