Minutes & Attachments - Marine Corps Base Camp Pendleton
Minutes & Attachments - Marine Corps Base Camp Pendleton
Minutes & Attachments - Marine Corps Base Camp Pendleton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
IR SITE 1116 PHASE I & II SIPhase I SI – Geophysical Survey Near Building 140008GeophysicalSurvey Area512,000gallonUSTremovedin 1995IR SITE 1116 PHASE I & II SIPhase I SI Activities Conducted (April 2012)• Cone penetration test (CPT) investigation:• To facilitate the placement and screening of groundwatermonitoring wells.• 10 CPT locations at Subsite 140008.• 17 CPT locations at Subsite 1491.• Groundwater sampling at CPT locations withHydropunch® sampler.6