IR SITE 1116 PHASE I & II SISI ACTIVITIES (October 2012) – Subsite 14112• Summary of Groundwater Sampling results for the remaining Wells:(Analytes with at least one reported concentration above the respective ProjectScreening Limit):Analyte MinimumConcentration(μg/L) MaximumConcentration(μg/L)1,2-DCA 0.20 J (MW01) 0.96 J (MW10-1A)Benzene 0.31 J (MW10) 32 (MW01)Naphthalene 0.44 J (MW08) 150 (MW01)PCE 0.16 J (MW10) 0.27 J (MW01)TCE 0.85 J (MW11) 7.5 (MW05)cis-1,2-DCE 1 U (various) 13 (MW01)21IR SITE 1116 PHASE I & II SIQUESTIONS?22