IR SITE 1116 PHASE I & II SIIR SITE 1116 PHASE I AND PHASE IISITE INSPECTION RESULTS1JANUARY 17, 2013, FFA MEETINGIR SITE 1116 PHASE I & II SIHistory• March 2007 - Nine UST sites in Area 14 transferred to IRProgram. Designated as Site 1116.• We now refer to the UST sites as “Subsites” of Site 1116.• 2010 – Site Inspection investigated previously identifiedVOCs in soil and groundwater at six Subsites.• February 2011 – SI Report recommended additionalinvestigations for Subsites 1491, 14112 and 140008.• EE/CA and Action Memorandum for interim remedialaction have been approved by the FFA.2