SECTION 720 -- CONCRETE PIPE CULVERTS720.01 -- DescriptionThis work shall consist <strong>of</strong> furnishing and installing new reinforced concrete culvert pipe(round, pipe-arch, and elliptical) and reinforced concrete slotted pipe and the relaying <strong>of</strong>existing reinforced concrete pipe at locations shown in the plans and in accordance with therequirements <strong>of</strong> these Specifications.720.02 -- Material Requirements1. The Contractor shall not order the pipe until a list <strong>of</strong> sizes and lengths isfurnished by the Engineer.2. Reinforced concrete culvert pipe shall conform to the requirements <strong>of</strong>Section 1037.plans.List.3. Reinforced concrete slotted pipe shall conform to the requirements shown in the4. Approved preformed plastic gaskets are shown in the NDR Approved Products720.03 -- Construction Methods1. Excavation and backfilling shall be performed by the Contractor in accordancewith the requirements <strong>of</strong> Section 702.2. a. The Contractor shall lay the pipe true to established lines and gradeswith hub, bell, or groove ends upstream and spigot or tongue ends fully entered into theadjacent sections <strong>of</strong> pipe.b. All concrete pipe laid for drainage structures, except that which has beenmanufactured with tongue and groove ends, shall be made watertight with cement mortar(1-part cement and 2-parts sand).c. When a bell and spigot section <strong>of</strong> pipe is laid, the lower portion <strong>of</strong> thehub, bell, or groove <strong>of</strong> the preceding pipe shall be filled on the inside with sufficient mortar tobring the inner surface <strong>of</strong> the abutting pipes flush and even.d. After the pipe is laid, the remainder <strong>of</strong> the joint shall be filled and packedwith cement mortar; and sufficient additional material shall be used to form a bead around thejoint.e. The inside <strong>of</strong> the joint shall be wiped and finished smooth.f. After the initial set, the cement mortar on the outside shall be protectedfrom the sun with a moist earth covering.- 565 -


3. As an alternate to mortared joints, rubber gaskets or flexible plastic gasketsmeeting the specification requirements <strong>of</strong> AASHTO M 198 may be used if the design <strong>of</strong> thejoints is in conformance with this AASHTO designation.4. a. When concrete pipe is laid for an irrigation structure, full compressiongaskets conforming to the requirements <strong>of</strong> ASTM C 361 shall be used and installed on eachsection <strong>of</strong> the pipe as per the manufacturer's recommendations and standards.b. In the event that full compression gaskets are not available for the type<strong>of</strong> pipe specified, a preformed plastic gasket for concrete pipe joints shall be supplied meetingFederal Specification SS-S-00210, "Sealing Compound, Preformed Plastic for <strong>Pipe</strong> Joints"Type 1, Rope Form.c. The Contractor shall hydrostatically test all precast concrete pipe laid forirrigation structures. Where the bottom grade <strong>of</strong> the pipeline at the outlet is less than 1.2 mabove the inside top <strong>of</strong> the pipe at its lowest point, no test will be required. Water for makingthe tests shall be furnished by the Contractor and shall be introduced into the siphons andpipelines in such a manner as to prevent rapid temperature drops in the pipe.d. Tests shall be made as soon after completion <strong>of</strong> construction <strong>of</strong> thestructure as practicable, but in no event sooner than 20 days after the placing <strong>of</strong> any concretethat will be subject to hydrostatic pressure during the test. Testing under full operating heador to heads designated by pipe classification will not be required, but the lines shall be testedto the maximum practical head by filling with water to the elevation <strong>of</strong> the bottom grade <strong>of</strong> theoutlet end or by other methods as directed by the Engineer. After the pipe has been filled tothe specified elevation, it may be allowed to stand for a period not to exceed 15 days tosaturate the pipe before testing. The test period shall be for 24 consecutive hours duringwhich time the water surface in the structure shall be maintained at the specified test elevation.e. The total amount <strong>of</strong> leakage during this 24 hour test period shall notexceed 20 L/mm <strong>of</strong> internal diameter per kilometer. If the leakage exceeds 60 percent <strong>of</strong> themaximum allowed, the Engineer may require the water to be maintained at the limitingelevation stated above for an additional period <strong>of</strong> 10 days to allow evidence <strong>of</strong> excessiveleakage at any point to become apparent. Individual leaks, evidenced by appearance <strong>of</strong>moisture, shall be repaired.f. The Contractor shall make all repairs or replacements, or both, that arenecessary to secure the required watertightness.g. The Contractor shall be responsible for any damage to the structures oradjacent works due to testing.h. The Contractor shall furnish all labor, equipment, materials, tools, water,and water-measuring apparatus required for making the tests; and the cost there<strong>of</strong> shall beincluded in the unit bid price for the size <strong>of</strong> pipe being tested.5. Any pipe which is not true in alignment or to the established grade or whichshows any settlement shall be removed and reinstalled by the Contractor at no additional costto the <strong>Department</strong>.- 566 -


6. When the plans designate the extension <strong>of</strong> a concrete pipe culvert, theconnection shall be made by enclosing the connecting joint with a concrete collar. The collarshall be constructed in accordance with the requirements <strong>of</strong> Section 704; and the steelreinforcement shall be furnished, handled, and placed in accordance with the requirements <strong>of</strong>Section 707. In all cases where a concrete headwall is in place, it shall be completelyremoved.7. <strong>Concrete</strong> culvert pipe which is designated to be relaid shall be cleaned <strong>of</strong>accumulations <strong>of</strong> soil and debris, hauled, and relaid in accordance with the methods hereindescribed for installing new pipe.720.04 -- Method <strong>of</strong> Measurement1. Excavation, concrete, and reinforcement for headwalls and collars will bemeasured for payment in accordance with the provisions in Table 720.01.Table 720.01Method <strong>of</strong> MeasurementRequirementsSubsectionExcavation for Structures.................................................................702.04<strong>Concrete</strong> ..........................................................................................704.04Steel Reinforcement ........................................................................707.042. See Subsection 718.04 for the methods to measure concrete pipe.3. <strong>Concrete</strong> pipe collar connections are measured by the cubic meter <strong>of</strong> concreteand kilograms <strong>of</strong> reinforcing steel used.4. At the junction <strong>of</strong> new concrete pipes, the measurement shall be extended tothe center <strong>of</strong> the pipe being tapped. This extension shall be the total allowance for building thejunction.720.05 -- Basis <strong>of</strong> Payment1. Payment for excavation, concrete, and reinforcement for headwalls and collarsshall be made in accordance with the provisions in Table 720.02.Table 720.02Basis <strong>of</strong> PaymentRequirementSubsectionExcavation for Structures.................................................................702.05<strong>Concrete</strong> ..........................................................................................704.05Steel Reinforcement ........................................................................707.05- 567 -


2. Pay Item Pay Unit____ mm Reinforced <strong>Concrete</strong> <strong>Pipe</strong>____ mm Round Equivalent Reinforced<strong>Concrete</strong> <strong>Pipe</strong>____ mm Reinforced <strong>Concrete</strong> Slotted <strong>Pipe</strong>Relaying Reinforced <strong>Concrete</strong> <strong>Pipe</strong>Class _____ <strong>Concrete</strong> for <strong>Concrete</strong> CollarReinforcing Steel for CollarMeter (m)Meter (m)Meter (m)Meter (m)Cubic Meter (m³)Kilogram (kg)3. The cleaning and the hauling <strong>of</strong> the pipe from the site <strong>of</strong> removal or from theplace where it is stored to the point or points at which it is to be relaid will not be paid fordirectly, but shall be considered subsidiary to the work <strong>of</strong> relaying the pipe.4. Payment is full compensation for all work prescribed in this Section.- 568 -