12.07.2015 Views

Electrak: underfloor to workstation system guide - Legrand

Electrak: underfloor to workstation system guide - Legrand

Electrak: underfloor to workstation system guide - Legrand

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Electrak</strong> ® power track <strong>system</strong>sdesign and installation (continued)n Product configurationFlexible interlinkTap-off connectionTrack and flexible interlinkboxes must be securelyfixed inline <strong>to</strong> surface sono movement can takeplace after fixingDepress tap-off side clips and push downTap-offPush downSide clipRemove dust coverfrom power trackend entry socketbefore useInterlink feedentry socket.Remove dustcover labelPower trackMake sure both tapoffside clips are fullypushed home on bothsides of trackScrew fix <strong>to</strong> surfaceTrack feed (Cat. No. DF1010) Sub-cablingTap-off connectionTrack feed protective earthterminal and earth bondTap-off metalflexible conduitConnec<strong>to</strong>r terminalsProtective earth mustalways be connected viathe earth terminal blockLift lid20 mm Ø conduit fitting.Tighten back nut securelyLift terminal tab <strong>to</strong> accessterminal screws and closeafter use25 mm Ø cableconduit fixing holeClose lid and secure with lidfixing screw before power upTrack feed (Cat. No. JF2010) Sub-cablingTrack feed protective earthterminal and earth bondTap-off connectionTap-off metalflexible conduitConnec<strong>to</strong>r terminalsProtective earth mustalways be connected viathe earth terminal blockLift lid20 mm Ø conduit fittingTighten back nut securelyLift terminal tab <strong>to</strong> accessterminal screws and closeafter useClean earth25 mm Ø cableconduit fixing holeClose lid and secure with lidfixing screw before power up18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!