12.07.2015 Views

Electrak: underfloor to workstation system guide - Legrand

Electrak: underfloor to workstation system guide - Legrand

Electrak: underfloor to workstation system guide - Legrand

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

n Product configuration1. Select the type of distribution <strong>system</strong> - standard, or low noise / clean earth2. Select the means of powering the <strong>system</strong> - cable or power track tap-off3. Select the type of in-feed module <strong>to</strong> match the cable capacity - 16 A or 32 A4. Select the means of protection5. Select the number of socket modules from the 2, 3 or 4 gang range (individually fused or unfused)6. Select fixed or rotatable sockets7. Select the interconnection units if required8. Finish <strong>system</strong> with the end cap(All modules push fit and lock <strong>to</strong>gether on-site or can be fac<strong>to</strong>ry assembled <strong>to</strong> cus<strong>to</strong>mer requirement)Raised floorTap-offllllllllllllllllllllllllllllllllllllllllllllllllllllllFloor grommet1 2lllllllllllllllllllllllllllllllllllllllllllllllllllllllllliiiiiilIn-feed and power module push<strong>to</strong>gether and lock with camlock leverUnderfloor power track32 A in-feed connected <strong>to</strong> tap-off andleft <strong>underfloor</strong> until requiredTap-off and in-feed pulled through floorgrommet after testing and when required47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!