12.07.2015 Views

Assembly instructions - KLARO GmbH

Assembly instructions - KLARO GmbH

Assembly instructions - KLARO GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Assembly</strong> <strong>instructions</strong> for <strong>KLARO</strong> retrofit kitsFigure 27: Attaching the air hose to the cone by meansof cable tiesFigure 28: Attaching the air hose to the downpipe in asmooth curveAfterwards, the four air hoses must be pulled through the empty conduit by means of a pullwire. Particular care must be taken that the air hoses are not kinked.<strong>Assembly</strong> of the air barrier at the discharging air liftWhen integrating the hose for the airbarrier by means of a T-connector intothe air line of the excess sludge lifter, itmust always be ensured that any kinkingof the hoses during operation can beexcluded.The T-connector should be positionedabove the waterline.Connection with the air lineof the excess sludge lifterInlet connectorwith air lockClearwater lifterExcess sludge5. <strong>Assembly</strong> of the switch cabinetThe product description and technical data about your switch cabinet can be found in theassembly and commissioning <strong>instructions</strong> supplied with the switch cabinet.6. Commissioning of the plantAfter the installation of the Klaro retrofit kit, the connection of the air hoses in the pit and theassembly of the switch cabinet, the entire plant must be filled with fresh water. Only then maythe plant be commissioned. Information about the commissioning can be found in theassembly and commissioning <strong>instructions</strong> supplied with the switch cabinet.Version: 04/2013Subject to technical changes!<strong>KLARO</strong> <strong>GmbH</strong> 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!