The 65.5 m long canal bridge connects the <strong>lift</strong> with the upper basin. Like the <strong>lift</strong> caisson, it has a<br />

usable width of 12.5 m. Figures 6, 7 and 8 show different views of the canal bridge.<br />

Like the <strong>lift</strong> caisson, it is closed on the <strong>lift</strong> side by a swivel-radial g<strong>at</strong>e which is protected by a<br />

cable arrester facility. The g<strong>at</strong>e thus forms the eastern end of the summit reach of the canal. The<br />

clearance evacu<strong>at</strong>ion and reversing equipment is loc<strong>at</strong>ed in the eastern head area of the canal<br />

bridge, in addition to the g<strong>at</strong>e drives.<br />

On the right and left of the canal bridge there are side p<strong>at</strong>hs which can be used by maintenance<br />

vehicles. This makes it is possible to <strong>lift</strong> the heavy sliding g<strong>at</strong>es of the caisson evacu<strong>at</strong>ion<br />

equipment through openings using a truck-mounted crane on the canal bridge and to take them<br />

away for repair. For inspection purposes, the canal bridge can be viewed from the side p<strong>at</strong>hs using<br />

special vehicles th<strong>at</strong> can reach <strong>und</strong>erne<strong>at</strong>h it, as is customary for motorway bridges.<br />

In addition to the canal bridge, the 25 m long and up to 31.5 m wide western abutment supports<br />

the safety g<strong>at</strong>e with its g<strong>at</strong>e drive housings. The g<strong>at</strong>e is closed for scheduled emptying of the<br />

canal bridge, or if, in an emergency, there is a risk of w<strong>at</strong>er flowing out of the summit reach of<br />

the canal via the canal bridge or the <strong>lift</strong>. A hawser capture cavity with a volume of 75 m³ is integr<strong>at</strong>ed<br />

into the base of the abutment. To ensure th<strong>at</strong> the abutment reliably directs the horizontal<br />

loads from the canal bridge into the site fo<strong>und</strong><strong>at</strong>ions when the po<strong>und</strong> g<strong>at</strong>e is closed and the clearance<br />

is empty, it has fo<strong>und</strong><strong>at</strong>ions consisting of bored piles embedded in the solid boulder clay.<br />

For this reason, the 28 piles with a diameter of 1.2 m are 24 to 30 m long.<br />

On the headw<strong>at</strong>er side, the clay sealing layer of the upper basin and the safety bulkhead with an<br />

inspection walkway connect with the abutment. The connection with the canal sealing consists of<br />

a 3 m thick clay wedge. The integrity of the connection of the safety bulkhead with the abutment<br />

can be monitored from an inspection walkway which crosses the canal on the eastern side <strong>und</strong>er<br />

the abutment.<br />

Quelle: HPI<br />

Figure 7: Cross-section of the canal bridge<br />

10