12.07.2015 Views

Bae Hawk Operational Manual

Bae Hawk Operational Manual

Bae Hawk Operational Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

071) Using some epoxy to glue on thevertical stabilizer on the main fuselage.081) Install the main retracts landing gearon the main wing.091) Using the attached screws to tight up themain retract landing gear on the gearbay square hard wood.2) Using some double tape to fix the plasticwheel cover set on the main wing.3) Link up the push rob with the retract gearservo (remind to adjust the TX geartravel throw up to 110-115%)- 6 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!