12.07.2015 Views

transtherm studio installation instructions - Vintec and Transtherm

transtherm studio installation instructions - Vintec and Transtherm

transtherm studio installation instructions - Vintec and Transtherm

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 - Installing the upper securing plate:Remove the two black plastic bungs. Position <strong>and</strong> secure the plate using thetwo M5X15 screws. Remove the hinge cover.3 - Placing inside the cupboard:Position the cabinet inside the cupboard, against the right h<strong>and</strong> side if the dooris left h<strong>and</strong> opening, or vice versa for right h<strong>and</strong> opening.Check for stability, making sure the 2 front feet are in contact with the floor ofthe cupboard, thus avoiding any warping of the cabinet body once loaded. Ifthis is not the case, adjust the feet until contact is achieved. The cabinet mustbe located in such a way that the front is a maximum of 8mm from the front ofthe cupboard (see diagram on page 7). The cabinet must then be secured usingthe upper securing plate (2 cruciform head screws). Leave at least 1mm playbetween the cupboard upright <strong>and</strong> its door, to ensure cabinet sealing.4 - Securing the accompanying hinge:Secure the accompanying hinge to the doors of the cabinet <strong>and</strong> cupboard(see diagram page 7).English - P6


Securing the hingeThe line of the 2 holes must beperfectly parallel with theedge of the frame.1 - Screw the hinge guide ontothe door of the wine cabinet.2 - Open the door of the winecabinet to 90°, slide the railonto the guide <strong>and</strong> screw therail horizontally onto theinside of the cupboard door.30 94636150519,527,5Winecabinet doorCupboarddoorguidemax. 8


500mm560 min640 minVentilation200cm 2 each50mm50mm560 minHinge Thickness15mm max50mm525mmSlide SupportHingeVentilation200cm 2Ventilation Grid200cm 2 minCellar Depth 555mm totaldoor <strong>and</strong> hinge includedJoinery Dimension & Cut Out50mm560 minHinge Thickness15mm maxVentilation400cm 2640 min560 min50mm525mmSlide SupportHingeVentilation200cm 2Ventilation Grid200cm 2 minCellar Depth 555mm totaldoor <strong>and</strong> hinge includedJoinery Dimension & Cut Out

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!