Instructions Variant - SCAFOM-RUX UK
Instructions Variant - SCAFOM-RUX UK
Instructions Variant - SCAFOM-RUX UK
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Modular scaffolding <strong>RUX</strong>-VARIANT3 Erection of the <strong>RUX</strong>-VARIANT modular scaffoldModular scaffolding <strong>RUX</strong>-VARIANT3 Erection of the <strong>RUX</strong>-VARIANT modular scaffold3.5 StandardsSlot in the standards in zig-zag form and select the length of the standards such that the joints are atledger/transom level. Single-lift standards can be used on scaffolds of up to 3.0 m in height (Illustration 3-5).3.6 Locking wedgesConnect the next lift of ledgers and transoms, lower the wedges, but do not drive home.Illustration 3-5Illustration 3-6<strong>Instructions</strong> for erection and use valid only for the original <strong>RUX</strong>-VARIANT modular scaffolding system from <strong>RUX</strong> GmbH, Hagen, Germany!<strong>Instructions</strong> for erection and use valid only for the original <strong>RUX</strong>-VARIANT modular scaffolding system from <strong>RUX</strong> GmbH, Hagen, Germany!42 <strong>RUX</strong> GmbH · Phone +49 2331 4709-0 · Fax +49 2331 4709-202 · Mail rux@rux.de<strong>RUX</strong> GmbH · Phone +49 2331 4709-0 · Fax +49 2331 4709-202 · Mail rux@rux.de 43