12.07.2015 Views

Form to the project idea note (PIN)

Form to the project idea note (PIN)

Form to the project idea note (PIN)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Form</strong> <strong>to</strong> <strong>the</strong> <strong>project</strong> <strong>idea</strong> <strong>note</strong> (<strong>PIN</strong>)1. Project name and date of delivery Construction of Small hydro power plant“Prevalje“21/12/20102. Name of applicant: Institution / Entity: IGIS IMAKO Ltd.Public / Private: PrivateCore Activity: Trade and service providing3. Contact InformationContact: Predrag Armus Direc<strong>to</strong>rAddress: Krunska10 / 6, 11000 BeogradTel.: 011 / 3346-768Fax: 011/3346-769E-mail: igisimako@ptt.rs4. Location of <strong>project</strong> activities Region: Location Sumrakovac-Zlotska RiverCity: BorMunicipality: Bor5. Description of <strong>the</strong> <strong>project</strong>Describe <strong>the</strong> <strong>project</strong> activity, <strong>the</strong> main technicalparameters and technology <strong>to</strong> be used, possibleresults in terms of reducing emissions ofgreenhouse gases, contributing <strong>to</strong> sustainabledevelopment based on <strong>the</strong> criteria of sustainabledevelopment) (maximum 2 pages)The <strong>project</strong> involves <strong>the</strong> construction of smallhydropower plants, forces of up <strong>to</strong> 500 KW.SHPP Prevalje/ planned as a flow withoutreservoir, consist of water intake (Tyrolean-type),which are integral parts of a concrete sill andsettling along <strong>the</strong> watercourse, steel pipe forsupplying water <strong>to</strong> <strong>the</strong> machine building andmachine building itself. Planned environmentalwater intake does not endanger <strong>the</strong> environmentand <strong>the</strong> system as a whole does not affectupstream or downstream use of <strong>the</strong> remainingavailable hydro potential of this river.The <strong>project</strong> will significantly contribute <strong>to</strong>sustainable development in Serbia and is based onrenewable energy (hydropower).In this <strong>project</strong> emission reductions will be achievedby replacing <strong>the</strong> current electric and / or heatpower produced by burning fossil fuels, electricityand / or heat from a source with zero emission.


6. Current status of <strong>the</strong> <strong>project</strong>(Pre-feasibility study, feasibility study, only <strong>project</strong><strong>idea</strong>, preliminary design, detailed design, inconstruction, etc.).• The <strong>project</strong> will result in <strong>the</strong> transfer of moneyand modern "green" technology, direct investmentand active participation of local companies• Data <strong>project</strong> activity leads <strong>to</strong> a reduction inemissions of greenhouse gases and <strong>the</strong> emissionreductions are "additional".• The <strong>project</strong> will result in a reduced level ofemissions of CO2, SO2, NO2• The <strong>project</strong> activity will lead <strong>to</strong> energy efficiencyon <strong>the</strong> supply side of energy systems and demand.Project Idea7. Additionality (what would happen in <strong>the</strong>absence of <strong>project</strong> activity?)8. Assessment of financing <strong>the</strong> cost ofinvestment and available funds9. Time framePlease estimate <strong>the</strong> time frame forimplementation of <strong>the</strong> proposed <strong>project</strong>The <strong>project</strong> is additional since it faces significantfinancial, investment and technological barriers.Given <strong>the</strong> fact that <strong>the</strong> <strong>project</strong> leads <strong>to</strong> reductionof CO2 emissions, engaging in a <strong>project</strong> that willnot result in a CER certificates is a major risk <strong>to</strong> <strong>the</strong><strong>project</strong> owner who is also <strong>the</strong> owner of <strong>the</strong> parcel.In <strong>the</strong> absence of <strong>project</strong> activity Serbia will miss<strong>the</strong> opportunity <strong>to</strong> improve <strong>the</strong> criteria ofsustainable development, attract foreign inves<strong>to</strong>rs,and fur<strong>the</strong>r develop energy efficiency andrenewable energy.IGIS IMAKO will contribute 20-40% of capital, whileforeign funds <strong>to</strong> finance <strong>the</strong> rest.Investment costs of <strong>the</strong> <strong>project</strong> are estimated ataround 700 000 Euros.2010/2011 selection of international financialinstitutions for financing <strong>the</strong> <strong>project</strong>2011 The start of <strong>the</strong> implementation2012 Completion of construction and connection<strong>to</strong> <strong>the</strong> grid.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!