12.07.2015 Views

Form to the project idea note (PIN)

Form to the project idea note (PIN)

Form to the project idea note (PIN)

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Form</strong> <strong>to</strong> <strong>the</strong> <strong>project</strong> <strong>idea</strong> <strong>note</strong> (<strong>PIN</strong>)1. Project name and date of delivery Construction of small hydro power plant “Ribare“21/12/20102. Name of applicant: Institution / Entity: IGIS IMAKO Ltd.Public / Private: PrivateCore Activity: Trade and service providing3. Contact InformationContact: Predrag Armus Direc<strong>to</strong>rAddress: Krunska10 / 6, 11000 BeogradTel.: 011 / 3346-768Fax: 011/3346-769E-mail: igisimako@ptt.rs4. Location of <strong>project</strong> activities Region: “Ribare” on <strong>the</strong> river MlavaCity: ZagubicaMunicipality: Zagubica5. Description of <strong>the</strong> <strong>project</strong>Describe <strong>the</strong> <strong>project</strong> activity, <strong>the</strong> main technicalparameters and technology <strong>to</strong> be used, possibleresults in terms of reducing emissions ofgreenhouse gases, contributing <strong>to</strong> sustainabledevelopment based on <strong>the</strong> criteria of sustainabledevelopment) (maximum 2 pages)The <strong>project</strong> involves <strong>the</strong> construction of smallhydropower plants, forces of up <strong>to</strong> 514.80 KW.SHPP Ribare/ planned as a flow without reservoir,consist of water intake (Tyrolean-type), which areintegral parts of a concrete sill and settling along<strong>the</strong> watercourse, steel pipe for supplying water <strong>to</strong><strong>the</strong> machine building and machine building itself.Planned environmental water intake does <strong>note</strong>ndanger <strong>the</strong> environment and <strong>the</strong> system as awhole does not affect upstream or downstreamuse of <strong>the</strong> remaining available hydro potential ofthis river.The <strong>project</strong> will significantly contribute <strong>to</strong>sustainable development in Serbia and is based onrenewable energy (hydropower).In this <strong>project</strong> emission reductions will be achievedby replacing <strong>the</strong> current electric and / or heatpower produced by burning fossil fuels, electricityand / or heat from a source with zero emission.• The <strong>project</strong> will result in <strong>the</strong> transfer of money


and modern "green" technology, direct investmentand active participation of local companies• Data <strong>project</strong> activity leads <strong>to</strong> a reduction inemissions of greenhouse gases and <strong>the</strong> emissionreductions are "additional".• The <strong>project</strong> will result in a reduced level ofemissions of CO2, SO2, NO2• The <strong>project</strong> activity will lead <strong>to</strong> energy efficiencyon <strong>the</strong> supply side of energy systems and demand.6. Current status of <strong>the</strong> <strong>project</strong>(Pre-feasibility study, feasibility study, only <strong>project</strong><strong>idea</strong>, preliminary design, detailed design, inconstruction, etc.).Project Idea7. Additionality (what would happen in <strong>the</strong>absence of <strong>project</strong> activity?)8. Assessment of financing <strong>the</strong> cost ofinvestment and available funds9. Time framePlease estimate <strong>the</strong> time frame forimplementation of <strong>the</strong> proposed <strong>project</strong>The <strong>project</strong> is additional since it faces significantfinancial, investment and technological barriers.Given <strong>the</strong> fact that <strong>the</strong> <strong>project</strong> leads <strong>to</strong> reductionof CO2 emissions, engaging in a <strong>project</strong> that willnot result in a CER certificates is a major risk <strong>to</strong> <strong>the</strong><strong>project</strong> owner who is also <strong>the</strong> owner of <strong>the</strong> parcel.In <strong>the</strong> absence of <strong>project</strong> activity Serbia will miss<strong>the</strong> opportunity <strong>to</strong> improve <strong>the</strong> criteria ofsustainable development, attract foreign inves<strong>to</strong>rs,and fur<strong>the</strong>r develop energy efficiency andrenewable energy.IGIS IMAKO will contribute 20-40% of capital, whileforeign funds <strong>to</strong> finance <strong>the</strong> rest.Investment costs of <strong>the</strong> <strong>project</strong> are estimated ataround 750 000 Euros.2010/2011 selection of international financialinstitutions for financing <strong>the</strong> <strong>project</strong>2011 The start of <strong>the</strong> implementation2012 Completion of construction and connection<strong>to</strong> <strong>the</strong> grid.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!