.--AREVA NP Inc. ANP-3203Revision 0<strong>Vermont</strong> Yankee Nuclear Power StatioWs Overall Integrated <strong>Plan</strong> in Response <strong>to</strong> March 12, 2012Commission Order Modifying Licenses with Regard <strong>to</strong> Requirements <strong>for</strong> <strong>Reliable</strong> HardenedContainment Vents (Order Number EA-12-O50)Paoe 4Figure 1: Simplified Vent Line Connections <strong>to</strong> Wetwell and Other Systems-./-///-./•STACK/ //New CIV2New CIV1SGT SGT78.*0 *0-38 -3*Th -WfEL -Standby GasTreatmentSystemEquipment and components:The following equipment and components will be provided:i. HCVS Mechanical Components —a) Containment isolation piping, valves and controls - The HCVS vent piping andsupports up <strong>to</strong> and induding the second containment isolation will be designed in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!