12.07.2015 Views

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AREVA NP Inc. ANP-3203Revision 0<strong>Vermont</strong> Yankee Nuclear Power Station’s Overall Integrated <strong>Plan</strong> in Response <strong>to</strong> March 12, 2012Commission Order Modifying Licenses with Regard <strong>to</strong> Requirements <strong>for</strong> <strong>Reliable</strong> HardenedContainment Vents (Order Number EA-12-050)Page 22Section 4: Appilcable Quality RequirementsRequirement 2.1- Containment Isolation FunctionThe HCVS system design shall not preclude the containment isolation valves, Including the vent valve <strong>from</strong>per<strong>for</strong>ming their intended containment isolation function consistent with the design basis <strong>for</strong> the plant Theseitems include piping, piping supports, containment isolation valves, containment isolation valve actua<strong>to</strong>rsand containment isolation valve position indication componentsISG 2.1 Criteria:The HCVS vent path up <strong>to</strong> and including the second containment isolation barrier shall be designedconsistent with the design basis <strong>of</strong> the plant These items include piping. piping supports, containmentisolation valves containment isolation valve actua<strong>to</strong>rs and containment isolation valve position indicationcomponents The HCVS design, out <strong>to</strong> and including the second containment isolation bamer shall meetsafety-related requirements consistent with the design basis <strong>of</strong> the plant The staff notes that in response <strong>to</strong>GL 89-16, in many cases. the HCVS vent tine connections were made <strong>to</strong> existing systems. In some cases.the connection was made in between two existing containment isolation valves and in others <strong>to</strong> the vacuumbreaker line The HCVS system design shall not preclude the containment isolation valves, including thevent valve <strong>from</strong> per<strong>for</strong>ming their intended containment isolation function consistent with the design basis <strong>for</strong>the plant. The design shall include all necessary overrides <strong>of</strong> containment isolation signals and otherinterface system signals <strong>to</strong> enable the vent valves <strong>to</strong> open upon initiation <strong>of</strong> the HCVS <strong>from</strong> its control panelResponse (ref. ISG Item 2.1):The HCVS vent path up <strong>to</strong> and including the second containment isolation piping and supportsis designed in accordance with existing design basis. The HCVS system design will notpreclude the containment isolation valves, including the vent valve, <strong>from</strong> per<strong>for</strong>ming theirintended containment isolation function consistent with the design basis <strong>for</strong> the plant.Associated actua<strong>to</strong>rs, position indication, and power supplies are designed consistent with thedesign basis <strong>of</strong> the plant as required <strong>to</strong> maintain their design basis function <strong>of</strong> maintaining thevalves closed. The control circuit will allow operation <strong>of</strong> the HCVS <strong>from</strong> its control panelregardless <strong>of</strong> containment isolation signals.Requirement 2.2 -<strong>Reliable</strong>and Rugged Per<strong>for</strong>manceAll other HCVS components shall be designed <strong>for</strong> reliable and rugged per<strong>for</strong>mance that is capable <strong>of</strong>ensuring HCVS functionality following a seismic event. These items include electncal power supply, valveactua<strong>to</strong>r pneumatic supply, and instrumentation (local and remote) componentsISG 2.2 Criteria:All components <strong>of</strong> the HCVS beyond the second containment isolation barrier shall be designed <strong>to</strong> ensureHCVS functionality following the plants design basis seismic event These components include, in addition<strong>to</strong> the hardened vent pipe, electric power supply. pneumatic suppfr and instrumentation The design <strong>of</strong>power and pneumatic supply lines between the HCVS valves and remote locations (if portable sources were<strong>to</strong> be employed) shall also be designed <strong>to</strong> ensure HCVS functionality Licensees shall ensure that the HCVSwill not impact other safety-related structures and components and that the HCVS will not be impacted bynon-seismic components. The staff prefers that the HCVS components, includuig the piping run, be locatedin seismically qualified stivctures. However, short runs <strong>of</strong> HCVS piping in non-seismic structures areacceptable if the licensee provides adequate justification on the seismic ruggedness <strong>of</strong> these structures Thehardened vent shall be designed <strong>to</strong> con<strong>for</strong>m <strong>to</strong> the requirements consistent with the applicable design codes<strong>for</strong> the plant, such as the American Society <strong>of</strong> Mechanical Engineers Boiler and Pressure Vessel Code andthe applicable Specifications, Codes and Standards <strong>of</strong> the American Institute <strong>of</strong> Steel Construction.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!