12.07.2015 Views

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AREVA NP Inc.ANP-3203Revision 0<strong>Vermont</strong> Yankee Nuclear Power Station’s Overall Integrated <strong>Plan</strong> in Response <strong>to</strong> March 12, 2012Commission Order Modifying Licenses with Regard <strong>to</strong> Requirements <strong>for</strong> <strong>Reliable</strong> HardenedContainment Vents The CIVs will be operated in accordance with Emergency Operating Procedures(EOP) <strong>to</strong> control containment pressure. The HCVS will be designed <strong>for</strong>approximately 28 open/close cycles under prolonged SBO conditions. Controlledventing will be permitted iii the revised EOPs. A venting strategy will bedeveloped commensurate with the detailed design and associated analysis. Thecontrol circuit <strong>for</strong> the new vent ClVs will allow <strong>for</strong> manual override operation <strong>of</strong>the HCVS <strong>from</strong> its control panel regardless <strong>of</strong> the containment isolation signal.b) Passive: No passive component (e.g. rupture disk> will be installed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!