12.07.2015 Views

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

3-1-2013 Letter from VY to NRC Plan for Reliable ... - State of Vermont

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AREVA NP Inc.ANP-3203Revision 0<strong>Vermont</strong> Yankee Nuclear Power Station’s Overall Integrated <strong>Plan</strong> in Response <strong>to</strong> March 12, 2012Commission Order Modifying Licenses with Regard <strong>to</strong> Requirements <strong>for</strong> <strong>Reliable</strong> HardenedContainment Vents (Order Number EA-1 2-050)Pacie 26oonThe condition will entered in<strong>to</strong> the corrective action system,The HCVS availability will be res<strong>to</strong>red in a manner consistent with plantprocedures,A cause assessment will be per<strong>for</strong>med <strong>to</strong> prevent future unavailability <strong>for</strong> similarcauses.Requirement 3.2 - Train Appropriate PersonnelLicensee shall train appropnate personnel in the use <strong>of</strong> the HCVS The training cumcula shall includesystem operations when normal and backup power is available, and dunng S80 conditions.ISG 3.2 Criteria:All personnel expected <strong>to</strong> operate the HVCS shall receive training in the use <strong>of</strong> plant procedures developed<strong>for</strong> system operations when normal and backup power is available, and dunng SBO conditions consistentwith the plants systematic approach <strong>to</strong> training The training shall be refreshed on a periodic basis and asany changes occur <strong>to</strong> the HCVS.Response (ref. ISG Item 3.2):Personnel expected <strong>to</strong> per<strong>for</strong>m direct execution <strong>of</strong> the HVCS will receive necessary training inthe use <strong>of</strong> plant procedures <strong>for</strong> system operations when normal and backup power is availableand during prolonged SBO conditions. The training will be refreshed on a periodic basis and asany changes occur <strong>to</strong> the HCVS. The training will utilize the systematic approach <strong>to</strong> training.In addition, per NEI 12-06, all personnel on-site will be available <strong>to</strong> supplement trainedpersonnel.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!