Page 17 of 35For the purpose of this clause, the contract value of the works shall be taken as value of work as per contractagreement including any supplementary work order/ contract agreement issued. Provided also, that the totalamount of liquidated damages under this condition, shall not exceed the under noted percentage value or totalvalue of the item or groups of items of work for which a separate distinct completion period is specified in thecontract.(i) For contract value up to Rs. 2 lakhs 10% of the total value of the contract.(ii) For contract value above Rs. 2 lakhs 10% of the first Rs. 2 lakhs and 5 % of the balanceFurther competent authority while granting extension to the currency of the contract under clause 17(B) of<strong>Railway</strong> Bd’s GCC may also consider levy of token penalty as deemed fit based on the merit of the case.Provided further, that if the <strong>Railway</strong> is not satisfied that the works can be completed by the Contractor and inthe event of failure on that part of the contractor to complete the work within further extension of time allowedas aforesaid, the railway shall be entitled without prejudice to any other right or remedy available in that behalf,to appropriate the Contractor’s security deposit and rescind the contract under clause 62 of <strong>Railway</strong> Bd’s GCCconditions, whether or not actual damage is caused by such default.3.18 Instructions of Engineers RepresentativeAny instructions or approval given by the Engineer’s representative to the Contractor in connection with theworks shall bind the Contractor as though it had been given by the Engineer provided always as follows:a) Failure of the Engineer’s representative to disapprove and work or materials shall not prejudice the powerof the Engineer thereafter to disapprove such work or materials and to order the removal or breaking upthereof.b) If the Contractor shall be dissatisfied by reason of any decision of the Engineer’s representative, he shall beentitled to refer the matter to the Engineer who shall thereupon confirm or modify such decision.3.19 Meaning and intent of specification and drawings.If any ambiguity arises as to the meaning and intent of any portion of the specification and drawings or as toexecution or quality of any work or material or as to measurements of the works, the decision of the Engineerthereof shall be final subject to appeal (within 10 days of such decisions being intimated to the contractor) to theChief Electrical Engineer/Deputy Chief Electrical Engineer (Maint).3.20 Provision of efficient competent staff/Engineer.The contractor shall place and keep on the works at all time efficient and competent staff to give the necessarydirection to his workmen and to see that they execute their work in sound and proper manner and shall employonly such supervisors, engineer workmen and labourers, in or about execution of any of the works as are carefuland skilled in their various trades and callings. The contractor shall at once remove from the works any agents,permitted sub-contractor, supervisor, Engineer and if and whenever required by the Engineer, he shall submit acorrect return showing the names of all staff and workmen employed by him. In the event of the Engineer beingof the opinion that the Contractor is not employing on the works a sufficient number of staff and workmen as isnecessary for the proper completion of the works within the time prescribed, the Contractor shall forthwith onreceiving intimation to this effect take on the additional number of staff and labour specified by the Engineerwithin seven days of being so required and failure on the part of the Contractor to comply with such instructionswill entitle the <strong>Railway</strong> to rescind the Contract under Clause 3.52 of these conditions.3.21 Facilities for inspection.The Contractor shall afford the Engineer and the Engineer’s representative every facility for entering in andupon every portion of the work at all hours for the purposes of inspection or otherwise and shall provide alllabours, materials, plants, appliances etc. required for the purpose.3.22 Tools, Plant and Materials supplied by <strong>Railway</strong>.The Contractor shall take reasonable care of all tools, plant and materials or other property belonging to the<strong>Railway</strong> and committed to his charge for the purpose of the works and shall be responsible for all damage orloss caused by him, his agents, permitted Sub-Contractor or his workmen or others while they are in his charge.The Contractor shall sign accountable receipt for tools, plant and materials made over to him by the Engineerand on completion of the works shall hand over the unused balance of the same to the Engineers in good orderand repair free, wear and tear expected and shall be responsible for any failure to account for the same or anydamage done thereto.3.23 Hire or <strong>Railway</strong> Plant.Signature of the Tenderer with seal & date Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!