12.07.2015 Views

AHEC Final Cover.cdr - IIT Roorkee

AHEC Final Cover.cdr - IIT Roorkee

AHEC Final Cover.cdr - IIT Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX 8FOR ENGINEERING DIPLOMA LEVEL ELECTIVE COURSEFor the branches in Electrical, Instrumentation, Electronics Engg.1. Course Title: Hydro Power Engineering2.* Contact Hours: L: T: P:3.* Examination Duration (Hrs.): Theory : Practical :4.* Relative Weightage : CWS PRS MTE ETE PRE5.* Credit: 6.* Semester:7. Pre-requisite: NILAutumn Spring Both8. Details of Course:Sl.No.Particulars1. Introduction to Hydro Power Energy: Introduction to non-conventionalenergy. Types of energy – solar energy, wind energy, biomass energy,ocean & geothermal energy and hydrogen energy etc. What ishydropower energy? Need for hydropower energy and its powerestimation. Law of conservation of energy, Route of energy conversion.2. Types of Hydro Projects, Planning & Management: GovernmentHydropower policies, environmental issues, SWOT-(Strength weaknessopportunity threatening) of hydropower projects, type of clearance requiredfor Hydropower project, master plan, topography, catchments area, typesof streams, allotment of site-(Open bid, Mou, Joint venture). Survey &investigation, PFR-(Pre-feasibility report), DPR (Detailed Project Report),Process of development of site (announcement, allotment, clearance,agreement, commissioning).Types of survey- Topographical, metrological,hydrological, ecological, geological. Arial Rainfall Measurement, Type offlow measurement Devices-(Notch, weir, flume), dilution method, andFlow duration curve (important), flood – discharge estimation kripitechformula, dickens formula, English formula, hydrograph, unit hydrograph.Financial institution, SOI Map, Cost / Estimation – wheeling charges,Banking, Moratorium, PPA-(Power purchase agreement), SERC-(Stateelectricity regulatory commission) Hydrological cycle.* These are to be decided by the respective University/Board<strong>AHEC</strong>-<strong>IIT</strong>R/Ua. Govt./syllabus/WR-HPD/2006ContactHours4938

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!