(A)(B)APPENDICESSYLLABI FOR VARIOUS COURSESSUMMARY OF DISCUSSIONS HELD IN WORKSHOPSAppendix 1Appendix 2Appendix 3Appendix 4Water Resources Development (for the branches in Civil,Electrical, Mechanical, Industrial, Agriculture, Environmental,Production Engineering)Hydropower Engineering (for Branches Civil, AgricultureEngineering)Hydropower Development (for Branches in Electrical,Mechanical, Instrumentation, Electronics Engineering)Automation in Water Resources and Hydropower Plant (forElectronics, Electrical Engineering)23252729FOR ENGINEERING DIPLOMA LEVEL COURSESAppendix 5 Water Resources Development (for the branches in Civil,31Electrical, Mechanical, Industrial, Agriculture, Environmental,Production, Electrical Engineering)Appendix 6 Environmental Science (for all branches) 34Appendix 7 Hydropower Development Engineering (for the branches in 36Civil, Agriculture Engineering)Appendix 8 Hydro Power Engineering (for the branches in Electrical,38Instrumentation, Electronics Engineering)Appendix 9 Hydro Power Plants (for the branches in Mechanical, ChemicalEngineering)41FOR MASTER LEVEL COURSESAppendix 10Appendix 11Management Concept And Practices (for all Master LevelCourses except Management and Commerce)Environmental Impact Assessment (for all Master LevelCourses)4446SHORT TERM TRAINING COURSESAppendix 12 Six weeks Short Term Programme in Water Resources/Hydro 48Power Development (for Engineering Degree and DiplomaPassed out Students)Appendix 13 Educational Institutions in Uttaranchal 49PROCEEDINGS OF THE WORKSHOPSAppendix 14 Summary of Discussions held on April 30, 2005 62Appendix 15 Summary of Discussions held on June 22, 2005 65Appendix 16 Summary of Discussions held on June 28, 2005 70Appendix 17 Summary of Discussions held on Sept. 30, 2005 73<strong>AHEC</strong>-<strong>IIT</strong>R/Ua. Govt./syllabus/WR-HPD/2006
EXECUTIVE SUMMARYGovernment of Utttaranchal gave an assignment to Alternate Hydro EnergyCentre (<strong>AHEC</strong>), Indian Institute of Technology <strong>Roorkee</strong> (<strong>IIT</strong>R) to prepare Syllabi for“Leveraging Rich Potential of Water and Hydro Resources in Uttaranchal” to increaseemployment opportunities in Uttaranchal.Four workshops were organized by <strong>AHEC</strong> to discuss and collect views of all thestake-holders. Detailed syllabi for 12 courses have been prepared. It is recommendedthat the following activities should be undertaken to achieve the desired objectives:(a)(b)(c)(d)(e)Introduction of new subjects in existing course in the areas relevant toHydro Power Development and Water Resources Management at differentlevels.Organisation of training of teachers who could teach these courses and toprepare teaching manuals for them,Strengthening of existing laboratories and libraries in select institutionsVisit of students and teachers to water resource management schemes andhydro power projects, participation in conferences and visit ofprofessionals to deliver special lectures in select institutions who willinitiate running these courses andOrganisation of short term courses for already passed out studentsPreparation of manuals and conducting training programmes for teachers willinvolve an expenditure of Rs. 31.00 lacs. It is proposed that new courses should beintroduced initially in 2 Engineering Degree Colleges, 5 Postgraduate Institutions, 7Polytechnics and 5 ITIs and these institutions should undertake activities listed abovewith initial expenditure of Rs. 21.00 lacs and annual recurring expenditure of Rs. 30.55lacs.<strong>AHEC</strong>-<strong>IIT</strong>R/Ua. Govt./syllabus/WR-HPD/2006
- Page 1 and 2: mÙkjkapy “kkluOctober 2006
- Page 3 and 4: IIT Roorkee Team Involved in Prepar
- Page 5: CONTENTSEXECUTIVE SUMMARYPage Nos1
- Page 9 and 10: A meeting chaired by Development Co
- Page 11 and 12: are envisaged in the future. The po
- Page 13 and 14: 1. Environment Impact Assessment2.
- Page 15 and 16: 6. SUBJECTS TO BE INTRODUCED:In the
- Page 17 and 18: Engineering should not be introduce
- Page 19 and 20: 7.1 Identified and Designed Courses
- Page 21 and 22: 3. Kumaon University, Nainital4. HN
- Page 23 and 24: 7.8 Funds should be provided in tho
- Page 25 and 26: Sl.No.Item4. Inviting the professio
- Page 27 and 28: Sl.No.ItemCost/institution4. Inviti
- Page 29 and 30: AHEC-IITR/Ua. Govt./syllabus/WR-HPD
- Page 31 and 32: Sl.No.Particulars• Damso Type of
- Page 33 and 34: Suggested Readings:1. CBIP, “Hydr
- Page 35 and 36: Sl.ParticularsNo.9. Mechanical Auxi
- Page 37 and 38: Sl.No.Particulars5. Control of freq
- Page 39 and 40: Sl.No.Particulars4. WATER RESOURCES
- Page 41 and 42: APPENDIX 6FOR ENGINEERING DIPLOMA L
- Page 43 and 44: APPENDIX 7FOR ENGINEERING DIPLOMA L
- Page 45 and 46: APPENDIX 8FOR ENGINEERING DIPLOMA L
- Page 47 and 48: Suggested Readings:1. Bisht Tara Da
- Page 49 and 50: Sl.ParticularsNo.3. Types of Hydro
- Page 51 and 52: APPENDIX 10FOR ALL MASTERS’ DEGRE
- Page 53 and 54: FOR MASTERS’ DEGREE LEVEL COURSES
- Page 55 and 56: APPENDIX 12SIX WEEKS SHORT TERM PRO
- Page 57 and 58:
AddressSGRR Institute of Tech. & Sc
- Page 59 and 60:
LIST OF DEGREE COLLEGES IN UTTARANC
- Page 61 and 62:
Dr. D.K. Shah,Principal,Govt. Degre
- Page 63 and 64:
GOVERNMENT ITIs UTTARANCHALSl.No.Na
- Page 65 and 66:
Sl.No.Name of ITIs30 ROPS Askot,ROP
- Page 67 and 68:
Sl.No.Name of ITIs58 ROPS Jahiracha
- Page 69 and 70:
APPENDIX 14Summary of Discussions o
- Page 71 and 72:
Person attended the meeting on Apri
- Page 73 and 74:
have to take apprentices in their o
- Page 75 and 76:
Following attended : June 22, 2005
- Page 77 and 78:
APPENDIX 16Summary of Discussions w
- Page 79 and 80:
Following attended : June 28, 2005
- Page 81 and 82:
Hydropower plantsfor Mechanical /Ch
- Page 83 and 84:
Mechanical TradeHydraulic turbinesP
- Page 85 and 86:
8. Dr. RP Mathur,Former Professor,6
- Page 87:
22. Shri KC Jain,General Manager,UJ