12.07.2015 Views

EQUALIZER Flow Control Devices Enhanced ... - Baker Hughes

EQUALIZER Flow Control Devices Enhanced ... - Baker Hughes

EQUALIZER Flow Control Devices Enhanced ... - Baker Hughes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case History<strong>EQUALIZER</strong> <strong>Flow</strong> <strong>Control</strong> <strong>Devices</strong> <strong>Enhanced</strong>Production and Efficiency in SAGD WellsProduction increased 33% and steam/oil ratio decreased 20%compared to slotted liner pairsPad 102 North Cumulative Bitumen Versus Sychronized TimeBenefits• Increased bitumen production by 33%• Saved money by reducing steamrequirements, liner sizes, andcasing sizesBackground and challenges• SAGD field, Alberta, Canada• Three-year study of flow distributioncontrols in horizontal liners in aninjection and production well pair• Two offset well pairs on the same padwith similar geology were usedfor comparison<strong>Baker</strong> <strong>Hughes</strong> solution and results• <strong>Baker</strong> <strong>Hughes</strong> <strong>EQUALIZER</strong> flow controldevices were installed in liner stringsof two wells• <strong>Baker</strong> <strong>Hughes</strong> CENtigrade ExtremeTemperature ESP provided liftingpower to compensate for pressuredrop from <strong>EQUALIZER</strong> devicesm3The <strong>EQUALIZER</strong> 102-06 well pair produced 33% more bitumen than two conventional well pairs with similargeologic conditions in the same well pad.Beginning in 2007, ConocoPhillipsconducted a three-year test in its Surmontbitumen field in Alberta, Canada. Thepurpose was to compare the performanceof a steam-assisted gravity drainage(SAGD) well pair that was completedwith passive inflow control devices to theperformance of conventional slotted-linerwell pairs from the same well pad. Resultsof the study proved superior performanceby <strong>Baker</strong> <strong>Hughes</strong> <strong>EQUALIZER</strong> flowcontrol devices.After the initial well pairs in the SurmontPhase 1A SAGD began operation in July2007, monitoring information and aseismic survey suggested that on average,the distribution of the developing steamchambers was less than 50% of the fullcompletion length of the wells.Synchronized Time, MonthsWhen the next set of wells was drilled in2008, flow distribution control was testedto determine whether it could improveearly steam chamber performance. Aflow distribution liner system using<strong>Baker</strong> <strong>Hughes</strong> <strong>EQUALIZER</strong> flow controldevices was designed and installedin Surmont 102-06 to compare steamchamber performance with results fromthe standard design used in Phase 1A.<strong>EQUALIZER</strong> flow control devices areconstructed of unique helical flowchannels that impose pressure distributionalong the entire wellbore. This controls thelocal injection or production rate alongthe wellbore. <strong>EQUALIZER</strong> devices have nomoving parts or elastomer seals.


Following steam circulation in 102-06 topreheat both the injector and producerwells, the toe tubing strings werepulled and the well pair was placed intooperation in April 2009 using only the heeltubing strings for injection and production.The injection well used a 6 5 /8-in. linerinstead of the standard 8 5 /8-in. injectionliner. This smaller liner allowed reductionof the intermediate surface casing size. Theproducer well also used the 6 5 /8-in. liner inplace of the standard 7-in. liner normallyused at Surmont. Reducing liner andcasing sizes resulted in cost savings.CSOR, m3/m3CSOR Pad 102N Well PairsSynchronized Time, MonthsThe test demonstrated that flowdistribution control built into the linercan eliminate the need for the toe tubingstring and achieve the target flow capacitywith a smaller liner. It also showed thata completion using effective flow controldevices such as the <strong>EQUALIZER</strong> systemsforces a more uniform distribution alongthe liner than the typical slotted linercompletion can achieve.Compared to two well pairs on the padwith similar geology, 102-06 developed alarger, more uniform steam zone (withouttoe strings) and achieved higher bitumenproduction, producing 33% more bitumenthan comparable offset well pairs. Inaddition, 102-06 operated at a 20% betterthermal efficiency in terms of cumulativesteam/oil ratio.Compared to offset well pairs in similar geologic conditions, the <strong>EQUALIZER</strong> 102-06 well pair had a lowersteam/oil ratio and operated more efficiently.Temperature, °CSurmont 102-06 Temperatures 2011 11 04The <strong>EQUALIZER</strong> completion in the producer well maintained a consistent steam temperature to the toe ofthe lateral.After the second year, an electricalsubmersible pumping (ESP) system wasinstalled in the producing well of 102-06to replace the gas lift system. The ESPincreased the emulsion rate to 35,315 ft 3 /d(1000 m 3 /d) compared to 26,486 ft 3 /d(750 m 3 /d) with gas lift. The ESP wasneeded to compensate for the 350 kPadesign pressure drop created by theflow control devices in the completion.Temperature was monitored using afiber-optic array with temperature sensorsspaced 65.6 ft (20 m) apart. Thesemeasurements showed that the linerachieved a consistent temperature profilealong its length without toe strings.ConocoPhillips described the results of thestudy in an SPE paper. “This test suggeststhat the flow distribution control linerbenefits…could dramatically improveSAGD commercial value,” wrote John L.Stalder of ConocoPhillips (SPE 153706).www.bakerhughes.comDisclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, <strong>Baker</strong> <strong>Hughes</strong> Incorporated and its affiliates donot make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, includingthose of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished “as is”and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BELIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.© 2013 <strong>Baker</strong> <strong>Hughes</strong> Incorporated. All rights reserved. 37049 05/2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!