12.07.2015 Views

BRACED WALL PANELS - City of Bremerton

BRACED WALL PANELS - City of Bremerton

BRACED WALL PANELS - City of Bremerton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FIGURE 7:PRESCRIPTIVE LATERAL RESTRAINT PANEL2'-0" min.4x12 Header min.2 - 2x Top plates.Stagger joints 4'-0" min.Nail 16d at 16" oc.Nail sheathing to headerat 3" on center each way.Double 2x studs spaced 24" o.c. max.End nail stud to top plate with 2-16d nails.Nail each stud to sole plate with4-8d toenails or 2-16d end nails.10'-0" MaxMinimum 3/8" sheathing, ( APA rated 24/0,exposure 1- contact material supplier fordetails. Shown cut away for clarity).Nailed to all studs, headers and plateswith 8d nails at 3" on center.Approved hooked-end wood to concreteconnector (hold-down) installed on each end<strong>of</strong> panel. Fasten connectors per manufacturespecifications to develop min. 2400# capacity1/2" dia. anchor bolts with minimum 7"embedment, and 3"x3"x1/4" galvanizedsquare plate washers.Approved Foundation System*For use only in garage and shed end walls.If a floor intervenes between foundation and braced panel, the plywood shall overlapthe rim joist and sill plate. Provide holddowns, bolts and plywood nailing as shown.#62—<strong>BRACED</strong> <strong>WALL</strong> <strong>PANELS</strong>Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!