12.07.2015 Views

Nationwide Permit 14 Summary - Nebraska Department of Roads

Nationwide Permit 14 Summary - Nebraska Department of Roads

Nationwide Permit 14 Summary - Nebraska Department of Roads

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

United States, or discharges <strong>of</strong> dredged or fillmaterial.23. Waterfowl Breeding Areas. Activities, includingstructures and work in navigable waters <strong>of</strong> theUnited States or discharges <strong>of</strong> dredged or fillmaterial, into breeding areas for migratorywaterfowl must be avoided to the maximum extentpracticable.24. Removal <strong>of</strong> Temporary Fills. Any temporary fillsmust be removed in their entirety and the affectedareas returned to their preexisting elevation.25. Designated Critical Resource Waters. Criticalresource waters include, NOAA-designated marinesanctuaries, National Estuarine ResearchReserves, National Wild and Scenic Rivers, criticalhabitat for Federally listed threatened andendangered species, coral reefs, State naturalheritage sites, and outstanding national resourcewaters or other waters <strong>of</strong>ficially designated by aState as having particular environmental orecological significance and identified by the DistrictEngineer after notice and opportunity for publiccomment. The District Engineer may alsodesignate additional critical resource waters afternotice and opportunity for comment.(a) Except as noted below, discharges <strong>of</strong> dredgedor fill material into waters <strong>of</strong> the United Statesare not authorized by NWPs 7, 12, <strong>14</strong>, 16, 17,21, 29, 31, 35, 39, 40, 42, 43, and 44 for anyactivity within, or directly affecting, criticalresource waters, including wetlands adjacentto such waters. Discharges <strong>of</strong> dredged or fillmaterials into waters <strong>of</strong> the United States maybe authorized by the above NWPs in NationalWild and Scenic Rivers if the activity complieswith General Condition 7. Further, suchdischarges may be authorized in designatedcritical habitat for Federally listed threatened orendangered species if the activity complieswith General Condition 11 and the U.S. Fishand Wildlife Service or the National MarineFisheries Service has concurred in adetermination <strong>of</strong> compliance with thiscondition.impacts to the critical resource waters will beno more than minimal.26. Fills Within 100-Year Floodplains. For purposes<strong>of</strong> this general condition, 100-year floodplains willbe identified through the Federal EmergencyManagement Agency's (FEMA) Flood InsuranceRate Maps or FEMA-approved local floodplainmaps.(a) Discharges in Floodplain; Below Headwaters:Discharges <strong>of</strong> dredged or fill material intowaters <strong>of</strong> the United States within the mapped100-year floodplain, below headwaters (i.e.five cfs), resulting in permanent above-gradefills, are not authorized by NWPs 39, 40, 42,43 and 44.(b) Discharges in Floodway; Above Headwaters:Discharges <strong>of</strong> dredged or fill material intowaters <strong>of</strong> the United States within the FEMA orlocally mapped floodway, resulting inpermanent above-grade fills, are notauthorized by NWPs 39, 40, 42, and 44.(c) The permittee must comply with any applicableFEMA-approved state or local floodplainmanagement requirements.27. Construction Period. For activities that have notbeen verified by the Corps and the project wascommenced or under contract to commence by theexpiration date <strong>of</strong> the NWP (or modification orrevocation date), the work must be completedwithin 12 months after such date (including anymodification that affects the project).For activities that have been verified and theproject was commenced or under contract tocommence within the verification period, the workmust be completed by the date determined by theCorps.For projects that have been verified by the Corps,an extension <strong>of</strong> a Corps approved completion datemay be requested. This request must be submittedat least one month before the previously approvedcompletion date.(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25,27, 28, 30, 33, 34, 36, 37, and 38, notificationis required in accordance with GeneralCondition 13, for any activity proposed in thedesignated critical resource waters includingwetlands adjacent to those waters. The DistrictEngineer may authorize activities under theseNWPs only after he determines that the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!