12.07.2015 Views

2009 - Illinois DNR - State of Illinois

2009 - Illinois DNR - State of Illinois

2009 - Illinois DNR - State of Illinois

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 26: Alternative D5 - Combine Alternatives C2 and S8 Cost EstimateFarmer/Prairie CreekAlternative D5 Cost Estimate Aug 04Line Unit TotalItem Item Quantity Unit Price CostAlt. S8 Belleau Lake Alternative 1 Each $66,651 $66,65154213723 Precast Reinf. Conc. End 1 Each $3,000 $3,00054010504 60" Concrete Pipe 4200 Ft $255 $1,071,00060248000 Junction Chamber N1 1 Each $12,000 $12,00060221100 Manhole 9 Each $2,200 $19,80020800150 Trench Backfill (Road) 2178 CY $28 $60,97844000100 Pavement Removal 3267 SQ $6 $19,56744100100 Pavement Replacement 3267 SQ $75 $245,000FR-416,129 Tideflex for 54" x 36" RCP 1 Each $35,000 $35,000C2 Contingencies (15%) and Mobilization (6%) <strong>of</strong> subtotal $307,932Construction Cost $1,840,929Engineering (20%) and Construction Supervision (7.5%) $506,255Alts. C2, S8 Right-<strong>of</strong>-Way Cost* 749320 SQ $0 $0Total Project Cost $2,347,184Alternative Average Annual Cost (5.375% For 50 Years) $136,091O&M (1%) $18,409Alternative Average Annual Cost and O&M (1%) $154,500Baseline Average Annual Damages (Direct and Indirect) $144,531Alternative Average Annual Damages (Direct and Indirect) $85,164Alternative Average Annual Benefits $59,367Benefit Cost Ratio 0.38Frequency 1 2 5 10 25 50 100Existing Damaged Structures 0 1 2 11 38 64 96Alternative Damaged Structures 0 1 1 2 14 55 67Structures Removed from Floodplain 0 0 1 9 24 9 29* $0.00 Assessed value because <strong>of</strong> current public ownership.98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!