TABLE 8DAMAGESECONOMICSCONTINUED PLAN DESCRIPTION 1-YR 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR TOTAL AAD AAB EST. TOTAL COST O&M AAC B/CBASELINEBASELINE MODELWITH RAND PARKPUMP STATION$ STR $ STR $ STR $ STR $ STR $ STR $ STR (DIRECT+INDIRECT) (INCL. LAND RIGHTS) (INCL. O&M)$0 0 $16,297 1 $26,324 2 $73,377 11 $571,920 38 $1,576,405 64 $3,751,040 96 $144,531COMBINATIONIMPROVEMENTSALTERNATIVE D1ALTERNATIVE D2COMBINE C2, C6,S11COMBINE C2, S11$0 0 $0 0 $0 0 $0 0 $6,464 2 $55,022 10 $929,839 37 $18,038 $126,493 $5,863,000 $37,900 $377,840 0.33ALTERNATIVE D3COMBINE C6, S11$0 0 $0 0 $0 0 $0 0 $37,799 7 $227,382 21 $1,200,648 53 $27,519 $117,012 $5,749,000 $37,400 $370,731 0.32ALTERNATIVE D4COMBINE C7, S11$0 0 $0 0 $0 0 $0 0 $21,559 7 $100,794 15 $923,175 34 $19,466 $125,065 $3,654,000 $20,500 $232,361 0.54ALTERNATIVE D5COMBINE C2, S8$0 0 $0 0 $0 0 $0 0 $6,544 2 $51,129 9 $904,135 34 $17,509 $127,022 $3,883,000 $22,200 $247,339 0.51ALTERNATIVE D6COMBINE C7, S4$0 0 $16,297 1 $23,132 1 $32,622 2 $139,366 14 $1,435,386 55 $2,007,281 67 $85,164 $59,367 $2,347,000 $18,400 $154,481 0.38ALTERNATIVE D7COMBINE C4, S11$0 0 $16,297 1 $23,132 1 $36,045 3 $112,542 11 $946,350 30 $1,394,595 44 $64,374 $80,157 $3,173,000 $19,100 $203,072 0.39ALTERNATIVE D8COMBINE C8, S8$0 0 $0 0 $0 0 $0 0 $6,544 2 $75,547 14 $1,032,897 39 $20,266 $124,265 $3,770,000 $21,800 $240,387 0.52ALTERNATIVE D9ALTERNATIVE D10ALTERNATIVE D11COMBINE S11, C7 &C8COMBINE S11, C6 &C8COMBINE S2, S5, S8,C6, & C8$0 0 $16,297 1 $23,132 1 $54,010 6 $383,215 28 $1,550,515 64 $3,467,145 90 $127,272 $17,259 $1,791,000 $24,700 $128,543 0.13$0 0 $0 0 $0 0 $0 0 $0 0 $50,274 9 $935,912 34 $17,751 $126,780 $5,589,000 $46,300 $370,354 0.34$0 0 $0 0 $0 0 $0 0 $15,015 5 $99,939 15 $950,437 34 $19,627 $124,904 $5,361,000 $44,600 $355,434 0.35$0 0 $16,297 1 $23,132 1 $29,440 1 $108,832 7 $294,288 22 $1,419,234 47 $52,268 $92,263 $4,461,000 $40,100 $298,752 0.31OTHERALTERNATIVESALTERNATIVE L1PARKVIEW LANECULVERT$0 0 $16,297 1 $26,324 2 $73,377 11 $492,495 32 $1,264,694 54 $3,403,740 85 $128,856 $15,675 $7,800 $60 $512 30.60PREVIOUSALTERNATIVESALTERNATIVE 2A-2$82,561 $61,970 $6,787,000 $39,600 $433,114 0.14ALTERNATIVE 2E-2$82,561 $61,970 $8,321,000 $55,800 $538,257 0.12ALTERNATIVE C2 - DOWNSTREAM DEMPSTER STORM SEWER DIVERSION TO TOLLWAYALTERNATIVE C4 - ADDITIONAL DEE ROAD PIPEALTERNATIVE C6 - REPLACE RANCHO LANE CULVERTSALTERNATIVE C7 - REPLACE RANCHO LANE CULVERTS AND ADDITIONAL DEE ROAD PIPEALTERNATIVE C8 - CONFLUENCE TO BELLEAU LAKE CONVEYANCE
FLOOD DAMAGE REDUCTION ALTERNATIVESConceptually, five flood damage reduction measures were considered:1) Additional flood water storage in the watershed to reduce flood flows entering theflood damage areas;2) Channel conveyance improvements on Farmers and Prairie Creek.3) Other improvements to protect flood damage prone areas;4) Combinations <strong>of</strong> additional flood storage and channel conveyance improvements onFarmers and Prairie Creek; and5) Non-structural mitigation measures through structure modificationsThe storage, conveyance, combination, and other structural concepts were furtherdeveloped into 34 potential flood damage reduction alternatives for further investigation.STORAGE IMPROVEMENTSAlternative S1: Dude Ranch Pond Expansion With Lake Mary Anne Pump StationAlternative S2: Good Avenue PondAlternative S3: Lutheran General Hospital PondAlternative S4: Lutheran General Hospital Pond and High School ReservoirAlternative S5: High School ReservoirAlternative S6: Belleau Lake ExpansionAlternative S7: Lake Mary Anne Pump StationAlternative S8: Belleau Lake LoweredAlternative S9: Dude Ranch Pond With Lake Mary Anne Pump Station, GoodAvenue Pond, Lutheran General Hospital Pond, High SchoolReservoir, and Belleau Lake LoweredAlternative S10: Good Avenue Pond, Lutheran General Hospital Pond, HighSchool Reservoir, and Belleau Lake LoweredAlternative S11: Dude Ranch Pond With Lake Mary Anne Pump Station, LutheranGeneral Hospital Pond, High School Reservoir, and BelleauLake LoweredAlternative S12: Dude Ranch Pond ExpansionCONVEYANCE IMPROVEMENTSEight conveyance improvements were investigated at part <strong>of</strong> the study and arelisted below. Each <strong>of</strong> these conveyance alternatives investigated, would provideflood damage reduction benefits along Prairie Creek and sometimes along Upper26