12.07.2015 Views

SBAS operational introduction in aviation.

SBAS operational introduction in aviation.

SBAS operational introduction in aviation.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SBAS</strong> <strong>operational</strong> <strong><strong>in</strong>troduction</strong><strong>in</strong> <strong>aviation</strong>.Francisco SalabertHead of GNSS Policy OfficeEUROCONTROL


Table of contentsUse of WAAS <strong>in</strong> <strong>aviation</strong>EGNOS <strong>operational</strong> implementation <strong>in</strong> <strong>aviation</strong>:EUROCONTROL RNAV Approach Task ForceOperational area‣ EGNOS Performance Assessment‣ NOTAM‣ ProceduresSafety Key AreaGeneric Application Safety caseBenefits assessment Key AreaCost Benefit AnalysisLegal Key AreaLegal FrameworkCommunication Key AreaNational activitiesCertification process


WAAS statusThere are currently 1,389 published WAAS LPVs,surpass<strong>in</strong>g the number of Instrument Land<strong>in</strong>gSystem (ILS) procedures.


<strong>SBAS</strong> Avionics Status• Total WAAS avionics receivers sold ~35,000• Approximately 40% of ~120,000 IFR equippedGA aircraft are equipped with Garm<strong>in</strong> receivers– GNS-400/500 series new and upgrades available– G-1000 becom<strong>in</strong>g WAAS upgradeable• Flight Management System Interface morecomplicated, hence slower to the market– Rockwell-Coll<strong>in</strong>s: Provid<strong>in</strong>g both TSO WAASenabled multimode receivers and WAAS FMSsensors. Expect<strong>in</strong>g CRJ/Canadair 604 STC approval<strong>in</strong> FY‘08– CMC: FAA Tech Center’s Global 5000 aircraft to<strong>in</strong>tegrate CMC WAAS sensor <strong>in</strong>to Honeywell Primus2000 FMS by December 2008.– Universal Avionics: WAAS-enabled capability <strong>in</strong>dual thread UNS-1 FMS TSO. Supports: Helicopters,Turboprops, Bus<strong>in</strong>ess jets, regional aircraft, airtransport aircraft retrofits, FAA’s two Citations XLs


<strong>SBAS</strong> Avionics Status Cont’d• Southwest Airl<strong>in</strong>es– “Southwest Airl<strong>in</strong>es will equip more than 200 Boe<strong>in</strong>g 737legacy aircraft with Rockwell Coll<strong>in</strong>s' Global Position<strong>in</strong>g SystemGPS-4000S for Required Navigational Performance (RNP)operations. Installation beg<strong>in</strong>s <strong>in</strong> 2008.” 1– “Rockwell Coll<strong>in</strong>s' GPS-4000S sensor and associated WideArea Augmentation System (WAAS) antenna will allowimproved availability and <strong>in</strong>tegrity of GPS navigation.Additionally, WAAS provides service for all classes of aircraft <strong>in</strong>all flight operations, <strong>in</strong>clud<strong>in</strong>g en route navigation, airportdepartures and airport arrivals. “ 2• FedEx Express– Currently equipp<strong>in</strong>g 253 Cessna Caravan Aircraft with GNS-530W WAAS avionics and GMX-200 multi-function displays– Start<strong>in</strong>g to equip 48 Q400s with Universal UNS-1F avionics1,2 Rockwell Coll<strong>in</strong>s Press Release, January 15, 2008: Southwest selectsRockwell Coll<strong>in</strong>s' GPS system for RNP operations


EGNOS <strong>operational</strong> implementationEUROCONTROL coord<strong>in</strong>ates and harmonises <strong>operational</strong>implementation of EGNOS LPV operations across ECAC.Partnership frameworkCoord<strong>in</strong>ation with ECAC stakeholders: RNAV Approach Task Force(4 meet<strong>in</strong>gs/year).Participation at ICAO groups like AWOP, NSP (SARPS), IFPP(procedures design criteria),..EC: EUROCONTROL focal po<strong>in</strong>t for SES Community specification forEGNOS APVGSA: EUROCONTROL technical manager of GIANT project and MEDA.Coord<strong>in</strong>ation with EASA for avionics certification materialCoord<strong>in</strong>ation and lessons learnt from FAACoord<strong>in</strong>ation with SESAR activities on EGNOS


EGNOS <strong>in</strong> Aviation:EUROCONTROL RNAV Approach Task ForceEUROCONTROL coord<strong>in</strong>ation role:To ensure that the necessary material is available to enable RNAVapproaches to be implemented <strong>in</strong> a commonly agreed manner and tocommon standardsFocus on APV/Baro and APV/<strong>SBAS</strong>Develop Implementation Guidance Material for StatesSupport Initial ImplementationsFramework Programme - GIANTTEN-T funds (GSA – Eurocontrol)


Eurocontrol: Foster<strong>in</strong>g the development ofEGNOS/LPV Navigation Infrastructure Performance Assessment APV Procedures Design and Publication Flight Inspection Support Tools (e.g. M<strong>in</strong>ima Estimator Tool) Safety Case Generic ATC procedures for <strong>SBAS</strong> applications. Flight crew procedures Cont<strong>in</strong>gency Procedures <strong>SBAS</strong> status monitor<strong>in</strong>g and NOTAMS Bus<strong>in</strong>ess Case Tra<strong>in</strong><strong>in</strong>g material Implementation Guidance Material JAA/EASA Support – Airworth<strong>in</strong>ess/Ops Approval Navigation Data Quality


Operational Key Area <strong>SBAS</strong> Status Monitor<strong>in</strong>g requirements• Monitor and report status of navigation services• <strong>SBAS</strong>-ATC <strong>in</strong>terface Aircrew procedures Airworth<strong>in</strong>ess and Operational ApprovalCriteria• EASA material – AMC20-LPV <strong>in</strong> Draft version Aerodrome Infrastructure Requirements• Strip width and Light<strong>in</strong>g systems Guidel<strong>in</strong>es for Follow Up of GNSS<strong>in</strong>terference


EGNOS performance assessmentObjectives:a) Validate EGNOS performance vs MRD for <strong>aviation</strong>b) Support to the certification processEDCNEGNOS Data Collection Network


Eurocontrol EGNOS performance assessment IIPEGASUS. The reference tool for <strong>SBAS</strong> and GBAS performanceassessment (used <strong>in</strong> ASQF and PACF)PEGASUS was designed to facilitate the output data handl<strong>in</strong>g and <strong>in</strong>terchange. Thetool provides several functionalities such as computation of position and GNSSsystems attributes like accuracy, reliability, and availability simulat<strong>in</strong>g MOPScompliantreceivers, computation of trajectory errors, prediction of accuracyand availability. Integrity assessment


SIS SARPS Conformance


Operational Key Area Instrument Procedure Design• LPV criteria published <strong>in</strong> PANS-OPSDoc8168 Procedure Design Support Tools• Validation tools Eurocontrol M<strong>in</strong>ima Estimator Navigation Data Quality & ProcedureCod<strong>in</strong>g• Aeronautical data <strong>in</strong>tegrity• Eurocontrol FAS Data-block prototype AIP Publication requirements Ground/Flight Inspection requirements ATC procedures• Includ<strong>in</strong>g cont<strong>in</strong>gency procedures


Operational Key Area: GNSS NOTAM• Development of a NOTAM system to advise on EGNOSunavailabilities.• Covers users equipped with TSO145/146 avionics• NOTAMs generated for airports where RNAV (GNSS)procedures are published.• Strong coord<strong>in</strong>ation with Eurocontrol AIM doma<strong>in</strong>• Prototype to be delivered to Eurocontrol <strong>in</strong> January 2009• Next Steps:• Validation aga<strong>in</strong>st user expectations• Establish the l<strong>in</strong>k to the EGNOS System• Determ<strong>in</strong>e who will be the operator?The EGNOS operator, other centralised body or each <strong>in</strong>dividual State ?• Operational deployment of a GNSS NOTAM system


Safety Key Area Regulatory Process for EGNOS• S<strong>in</strong>gle European Sky framework• EGNOS Signal-In-Space Safety Case Part A: Design, Development and Deployment• ICAO SARPS Conformance Part B: Ma<strong>in</strong>tenance and Operation• EGNOS Service Provider Certification


Safety Key Area: APV Generic Safety Case• Objective:• To complete the Generic Safety Cases for two RNAV Approach TypesAPV/Baro and APV/<strong>SBAS</strong>• For each approach:• Operational Concept• FHA• PSSA• Generic Safety Case• Completion planned by July 2009• Endorsement from ECAC National Supervisory Authorities• Local Safety Case (ANSPs) Approval from National Authority


Objectives:Benefits Key Area:APV Benefits Assessment• Analyse the benefits of the implementation of RNAVapproach capability <strong>in</strong> Europe• In particular, we will:• Estimate the potential reduction <strong>in</strong> current <strong>operational</strong>m<strong>in</strong>ima at case study airports• Evaluate the potential <strong>in</strong>crease <strong>in</strong> airport <strong>operational</strong>capacity• Estimate the correspond<strong>in</strong>g cost sav<strong>in</strong>gs from the result<strong>in</strong>greduction <strong>in</strong> number of aircraft missed approaches• Assess the European-wide implementation costs to bothANSP/airports & airspace users


Cost/Benefit Key AreaBus<strong>in</strong>ess Model and Cost Benefit Analysis• Generic Bus<strong>in</strong>ess model• Specific Bus<strong>in</strong>ess models (ANSPs, Airl<strong>in</strong>es,…)• GIANT Project: Bus<strong>in</strong>ess case for <strong>SBAS</strong> Equipage focused on AirNostrum – major Regional Airl<strong>in</strong>e Positive and promis<strong>in</strong>g results• EUROCONTROL RNAV Approach Bus<strong>in</strong>ess Case


Legal key area: framework for EGNOSECOwner of SystemServiceProvision contractESSP(EGNOS ServiceProvider andsystem operator)Certification as ANSPaccord<strong>in</strong>g to SESEGNOS SISICAO SARPS compliantEU StatesFrench NSA(NationalSupervisoryAuthority)Allow publicationof EGNOSproceduresor its usefor en-routeANSPs(AirNavigationServiceProviders)Allow useof EGNOS<strong>in</strong> eachairspace(e.g. procedurespublication)AirspaceUsers(Equippedwith a <strong>SBAS</strong>receivercertifiedby EASA)ECAC membersnot part of the EU


Legal Key AreaRecord<strong>in</strong>g of data on GNSS performance• Def<strong>in</strong>e requirements, develop guidel<strong>in</strong>es for legalrecord<strong>in</strong>g (ICAO)• Develop and implement systems to record GNSS data(States)


National Plans• France:• Focus on APV/<strong>SBAS</strong> ~ 200 procedures to bepublished by 2016 - APV/Baro where users request• Germany• Focus on APV/Baro ~ 17 International Airports by2010.• No Plans for APV/<strong>SBAS</strong>• UK• Baro/VNAV already <strong>operational</strong> – Heathrow andGatwick – other runways under consideration.• No plans for APV/<strong>SBAS</strong>• Switzerland• Strategy under development. Current work focussedon Helicopters• Spa<strong>in</strong>• Plans under development. Trials performed onAPV/<strong>SBAS</strong>


EGNOS Certification• Before EGNOS can be used for safety critical operations it should bedemonstrated that the system has been designed, deployed andoperated <strong>in</strong> a safe manner• Certification requirements basel<strong>in</strong>e - S<strong>in</strong>gle European Sky Regulatorypackage• Service Provision Regulation (EC No 550/2004) – Provision of air navigationservices <strong>in</strong> the S<strong>in</strong>gle European Sky• Commission Regulation (EC No 2096/2005) – ANSP certification process• Interoperability regulation (EC No 552/2004)• Cross recognition of NSA certificates with<strong>in</strong> Europe


EGNOS Certification ProcessTechnical File/System SafetyCaseService ProviderCertification ofthe EEODeclaration of theVerification ofsystemsNational ApplicationSafety CaseMilestonesGSANSAESAEurocontrolIndependent DataCollectionDesign SCPreparationOperations SCPreparationCertif. file preparationApplication submissionAssessmentPreparationApplication SCpreparationApplication submissionANSPAssessmentESSP identifiedSystem Safety Case ReadyNSP certificate to EEODeclaration of Verification of SystemsSOL service ready for AviationOct 08 March 09 Oct 09Start of taskEnd of taskMilestoneDependency• Nom<strong>in</strong>ation of the Service Provider• Service provider certification• Application for certification – from EGNOS SP tothe NSA of the country of its seat to berecognised as Navigation Service Provider (NSP)• Verification of compliance to the CommonRequirements – performed by the local NSA• Issue of Certificate – giv<strong>in</strong>g the EGNOS SP thequality of NSP, recognised <strong>in</strong> all EU countries• EC Declaration of Verification of systems –issued by EGNOS Service Provider <strong>in</strong> order todemonstrate compliance with the essentialrequirements• Submission of Declaration of Verification andtechnical file to the NSA• Declaration of SoL Service (removal of MT0)• Application safety case – use of EGNOSfor specific applications <strong>in</strong> a given<strong>operational</strong> environment• Use of EGNOS for SoL Operations


Status of EGNOS Certification• EGNOS System• Certifiable EGNOS System Release v 2.2 – under deployment• Operations Qualification Review (OQR) for v 2.2 – end 2008• EGNOS Service Provider• ESSP will be awarded with a contract to operate the system (2009 to 2013)• Application for Certification to the NSA of the country of the ma<strong>in</strong> seat• NSA – consultation process started• French NSA will be <strong>in</strong> charge of the certification process s<strong>in</strong>ce the ESSPheadquarters will be located <strong>in</strong> Toulouse as of September 2008• the work will be conducted by a group led by the French Authority andcomposed of the ma<strong>in</strong> European NSAs from the states represented <strong>in</strong> theEOIG• The process was started <strong>in</strong> September – targeted date end 2009


EGNOS Technical File• Technical File Part A – Design Safety Case• provides the demonstration that the system has been designed, developedand deployed <strong>in</strong> a manner compliant to ICAO SARPS• produced and ma<strong>in</strong>ta<strong>in</strong>ed by GSA• Technical File Part B – Operations Safety Case• provide the additional evidence and arguments that the system is operatedand ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> a manner compliant to ICAO SARPS• produced and ma<strong>in</strong>ta<strong>in</strong>ed by ESSP• Technical File Part C – Independent Assessment report• present actual system performance measured dur<strong>in</strong>g <strong>in</strong>itial operations andvalidate the safety argument based on real field data• produced by GSA with the Support of Eurocontrol and the EGNOS supportfacilities (ASQF and PACF)


Independent assessment• Sources of EGNOS real data• ASQF• PACF• RIMS Data• 6 <strong>in</strong>dependent locations• Eurocontrol• Eurocontrol contributions –contracts with universities• ANSP contributions – ANSPparticipation <strong>in</strong> the EDCNASQFPACFEurocontrol


QUESTIONS ?


Use of EGNOS <strong>in</strong> the MEDA region Managed by GSA <strong>in</strong> 2 phases:Euro Med GNSS I :a) Deployment of RIMS A (ESA)b) Prepare the development of applications (METIS project)Role ofEUROCONTROL<strong>in</strong> the <strong>aviation</strong> sectorEuro Med GNSS II:a) Deployment of RIMS B (ESA)b) Development of service enablers, Tra<strong>in</strong><strong>in</strong>g,Service provision preparation,…… Fund<strong>in</strong>g com<strong>in</strong>g from EC /DGAIDCO


Partnership with MEDA Countries<strong>in</strong> Aviation EC Euro Med project for <strong>aviation</strong> and agreements related to SES EUROCONTROL’s policy to support MEDA Countries<strong>in</strong> the development of Air Traffic Management systems Turkey is member of EUROCONTROL Bilateral Agreements with others (e.g. Morocco) 8 MEDA Countries are explor<strong>in</strong>g possibility of jo<strong>in</strong><strong>in</strong>gthe EUROCONTROL Pan-European functions :• Flow management: CFMU• Route Charg<strong>in</strong>g: CRCO• Aeronautical database: EAD


Development of EGNOS application <strong>in</strong> <strong>aviation</strong>The role of EUROCONTROLObjectives: Introduce EGNOS <strong>in</strong> the Navigation strategy and implementation plansof MEDA States EGNOS to be used by airspace users <strong>in</strong> the MEDA region EGNOS to provide a seamless Navigation capability between ECACand MEDAExpected role of EUROCONTROL <strong>in</strong> Euro Med GNSS II project: Support MEDA States: Pav<strong>in</strong>g the way for the use of EGNOSbased applications (e.g. LPV) Re-use and adapt the European experience to the MEDA regionbuild<strong>in</strong>g on METIS resultsTimel<strong>in</strong>e: 2 years (2009-2010)Legal Agreement still be<strong>in</strong>g discussed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!