12.07.2015 Views

Industrial Maintenance/Mining Maintenance - Western Wyoming ...

Industrial Maintenance/Mining Maintenance - Western Wyoming ...

Industrial Maintenance/Mining Maintenance - Western Wyoming ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II F. Previous RecommendationsThe Recommendations listed in the 2003 Program Review for <strong>Industrial</strong><strong>Maintenance</strong>/<strong>Mining</strong> <strong>Maintenance</strong> are as follows:RECOMMENDATIONSDesign survey forms geared towardstudents’ abilities in the areas of (1) criticalthinking and (2) retrieving and interpretinginformation.Add one additional hydraulic trainingbench to lab.Acquire storage space for equipment andmaterials.Repaint labs and carpet classrooms.ACTIONSGlenn Dalton created a rubric to measurestudent skills. Beyond this rubric, it isdetermined that no other survey form isnecessary because the Goals andObjectives table integrated in each<strong>Industrial</strong> <strong>Maintenance</strong> course syllabusspecifically addresses how critical thinking,and retrieving and interpreting informationfits into and is taught and measured ineach of our courses. The currentconsensus is that no other measures arerequired.Two additional hydraulics benches as wellas one pneumatics bench with elecropneumaticoption were purchased. Thiswas made possible from non-budgetfunding.A new metal building was built behind the<strong>Industrial</strong> <strong>Maintenance</strong> lab with a waste oilburner installed. This allowed us to havesome enclosed storage for the equipmentbeing changed out every five weeks. Wealso move equipment into the lab space in1511. This was made available by theaddition of the New Diesel lab and havingthe auto’s program move down one lab.Additional outside storage was addedoutside the <strong>Industrial</strong> <strong>Maintenance</strong> labs in2005. Painting: Room 1511 was painted inSummer 2009. Room 1508 is scheduledfor painting in Summer 2010. Room1510 and the 1509 (offices) still needpainting. Carpeting: No carpeting has beeninstalled because it is agreed that hardfloor surface with throw carpets would bemore suitable.<strong>Industrial</strong> <strong>Maintenance</strong>/<strong>Mining</strong> <strong>Maintenance</strong> Program Review 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!