Environmental management was targeted on complying with the Project’sEnvironmental License requirements granted by the Ministry of the Environment,Housing and Territorial Development - MAVDT - (for its acronym in Spanish), and tothe application of <strong>ISAGEN</strong>’s Environmental Policy.In the development of the Communal Information and Participation Program, numerousfollow-up meetings with the communities and authorities of the area of influence wereheld, in order to maintain them aware with first-hand information of the Project status.It is worth highlighting the creation of 180 jobs and the prioritizing given to locallabor, with 55% of the workers coming from the area as compared to the urban andregional participation. Such initiative complies with the Employment Policy, which hasbeen designed and agreed upon with the community representatives for effects ofsummoning, selecting, and hiring labor.Proyecto Trasvase MansoThe Manso River Diversion Project is located in the Caldas Department. The Projectconsists in diverting part of the Manso River waters towards the Amani dam of theMiel I hydroelectric power plant. The Project will increase the Plant’s generation in179 GWh/year.The MAVDT issued Resolution No. 1723 of September 21, <strong>2007</strong>, which ratified theecological flows defined in the Environmental License.Because of the latter, it was necessary therefore, to adjust the project scheme in orderto optimize it by taking into account the ecological flow defined in the EnvironmentalLicense. Consequently, the Company requested the MAVDT to modify the EnvironmentalLicense accordingly. Main variations against the original design consist inchanges in the tunnel slope and section to operate it in a free flow, the intake scheme,and discharge works.Amoya River Hydro electrical ProjectThe Amoya River hydro electrical project is located on the southern area of the TolimaDepartment, in the Chaparral municipality jurisdiction, 150 km. from Ibague.62 <strong>ISAGEN</strong> S.A. E.S.P. <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>2007</strong>
The project consists in a small bottom intake located downstream from the Davis Riveroutlet into the Amoya River. Conduction and powerhouse are underground. The loadtunnel will be 8,7-km long, with a powerhouse cavern where two generator groupswill be installed, as well as, vertical - 6-jets - Pelton-type turbines, power transformerswith 80 MW installed capacity, and a 2,8-km long discharge tunnel.The Project will have an estimated annual mean generation of 510 GWh/year, withEnvironmental License issued by the Autonomous Regional Corporation of Tolima- Cortolima - (for its acronym in Spanish), through Resolutions Nos. 1858 of 1999,and 0911 of 2006.During <strong>2007</strong>, several activities required previously to construction were carried out,in addition to the agreement and cooperation process with the communities of theProject’s area of influence in the Chaparral municipality.An inter-institutional agreement with Empresa de Servicios Públicos Domiciliarios (PublicDomiciliary Utilities Services) of Chaparral was subscribed for the aqueduct worksintervention. By the end of <strong>2007</strong>, and according to the agreement and cooperationprocess with the communities, such activities were initiated for achieving a permanentwater supply to the treatment plant that supplies the Chaparral municipality.In the process carried out for contracting the Project’s main civil works construction,including design, manufacturing, setup, setup supervision, tests, and delivery in operationof metallic linings, and distributor, three consortiums presented offers and <strong>ISAGEN</strong>and the firm, SEDIC, initiated the corresponding assessment.Likewise, the public bidding process for contracting design, manufacturing, supply,setup, setup supervision, electromechanical equipment tests, and delivery in operationof the power plant was initiated.Cortolima issued a favorable concept about <strong>ISAGEN</strong>’s proposal for the one-percentinvestment program execution for water use, in compliance with the project’s EnvironmentalLicense and Decree 1900 of 2006.Another activity initiated in <strong>2007</strong>, was the contract formalization with the Real EstateExchange of Tolima for procuring the properties required for the Plant construction.BUSINESS MANAGEMENT & PERFORMANCE63
- Page 3 and 4:
Notes of specific nature 1116. Tran
- Page 5 and 6:
MANAGEMENTLuis Fernando Rico Pinzó
- Page 7 and 8:
LETTER FROM THE BOARD OF DIRECTORSA
- Page 9 and 10:
achieved in the history of ISAGEN,
- Page 11 and 12: Management and performance of the o
- Page 15 and 16: INTRODUCTIONDuring 2007, ISAGEN str
- Page 18 and 19: ASSESSMENT OF 20071. PERFORMANCE AN
- Page 20 and 21: vote, receive profits, negotiate st
- Page 22 and 23: in order that the Board of Director
- Page 24 and 25: to provisions established in the Go
- Page 26 and 27: Information for decision-makingDuri
- Page 28 and 29: The selection of management positio
- Page 30 and 31: ISAGEN’s Internal Control System
- Page 34: 34 ISAGEN S.A. E.S.P. ANNUAL REPORT
- Page 38 and 39: ISAGEN presented contributions and
- Page 40 and 41: Figure 1AVERAGE PRICE OF CONTRACTS
- Page 42 and 43: Chart 4ISAGEN’S ENERGY TRADING TH
- Page 44 and 45: Primary Regulation response, as a r
- Page 46 and 47: of the assigned Firm Energy, while
- Page 48 and 49: Chart 12REVENUES FOR NATURAL GAS TR
- Page 53 and 54: Management and performance of human
- Page 55 and 56: Figure 1ISAGEN’S POWER PLANTS GEN
- Page 57 and 58: Predictive tests were performed to
- Page 61: During 2007, ISAGEN continued with
- Page 65 and 66: Andaqui Hydro electrical ProjectThe
- Page 69 and 70: ISAGEN has the firm intention of ma
- Page 71 and 72: The following figure depicts the fr
- Page 73: Likewise, the Ethics Committee was
- Page 80 and 81: For the stock market, 2007 was a co
- Page 82 and 83: CORPORATE VALUE RESULTSIn 2007, ISA
- Page 84 and 85: Figure 3OPERATIONAL COSTS AND EXPEN
- Page 86 and 87: GENERAL BALANCE SHEETDuring 2007, I
- Page 88: ISAGEN’S STOCK BEHAVIORISAGEN’s
- Page 92 and 93: ) Until December 31, 2006, negative
- Page 94 and 95: GENERAL BALANCE SHEETSON DECEMBER 3
- Page 96 and 97: RESULTS STATEMENTSFOR THE YEARS END
- Page 98 and 99: CASH FLOW STATEMENTSFOR THE YEARS E
- Page 103 and 104: NOTES TO FINANCIAL STATEMENTSON DEC
- Page 105 and 106: normative issued by the General Acc
- Page 107 and 108: Spare parts, materials, and other c
- Page 109 and 110: k. Financial derivativesThe Company
- Page 111 and 112: t. Reclassification of financial st
- Page 113 and 114:
8. Investments, netInvestments on D
- Page 115 and 116:
(2)The balance of this account if m
- Page 117 and 118:
In the specific case of Emcali, a f
- Page 119 and 120:
negative differences in assets’ b
- Page 121 and 122:
14. Other assetsOther assets on Dec
- Page 123:
During 2007, financial obligations
- Page 127 and 128:
Account reconcilement between accou
- Page 129 and 130:
The actuarial calculation includes
- Page 131 and 132:
24. Net worth revalorizationAccumul
- Page 133 and 134:
(1) Mainly includes provision recov
- Page 135 and 136:
31. Transactions and balances among
- Page 137 and 138:
REPORT OF THE LEGAL REPRESENTATIVEA
- Page 139:
REFERENCE TABLE FOR ACRONYMSABCCAAP