12.07.2015 Views

draft concession contract - PPP in Infrastructure Resource Center

draft concession contract - PPP in Infrastructure Resource Center

draft concession contract - PPP in Infrastructure Resource Center

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Concessionaire shall take reasonable precautions to prevent its staff, labour or otherPersons from remov<strong>in</strong>g or damag<strong>in</strong>g any such article or th<strong>in</strong>g. The Concessionaireshall, immediately upon discovery of such article or th<strong>in</strong>g, advise the Implement<strong>in</strong>gAuthority and the Independent Eng<strong>in</strong>eer, who shall issue <strong>in</strong>structions for deal<strong>in</strong>g withit.7.5.2 The Concessionaire shall be entitled to an extension of the Time for Completion ofthe relevant Construction Works and/or compensation from the Implement<strong>in</strong>gAuthority for all <strong>in</strong>creased costs and/or loss of revenue <strong>in</strong>curred or delay <strong>in</strong> receipt ofrevenue suffered by the Concessionaire and/or a relief from penalties under Clause11.9.2 (b), (c) and (d) as a result of hav<strong>in</strong>g followed the <strong>in</strong>structions of theIndependent Eng<strong>in</strong>eer issued pursuant to Clause 7.5.1. The Concessionaire shallgive notice to the Independent Eng<strong>in</strong>eer of any claim under this Clause with a copyto the Implement<strong>in</strong>g Authority. After receipt of such notice, the IndependentEng<strong>in</strong>eer shall proceed to determ<strong>in</strong>e:(a)(b)(c)any extension of the Time for Completion of the relevant Construction Worksto which the Concessionaire is entitled; and/orany monetary compensation to which the Concessionaire is entitled; and/orany relief from penalties under Clause 11.9.2(b), (c) and (d) to which theConcessionaire is entitled.7.5.3 Subject to comply<strong>in</strong>g with its obligations under Clause 7.5.1, the Concessionaireshall be required to m<strong>in</strong>imise and mitigate, and to procure that its sub-<strong>contract</strong>orsm<strong>in</strong>imise and mitigate, to the maximum extent reasonably possible theconsequences of any such discovery as is referred to <strong>in</strong> this Clause.7.6 Physical Conditions7.6.1 Subject as otherwise expressly provided <strong>in</strong> this Concession Contract, theConcessionaire shall bear all risks and costs with regard to:(a)(b)(c)any weather conditions, <strong>in</strong>clud<strong>in</strong>g, without limitation, floods;any pollution, contam<strong>in</strong>ation or other damage to the Site or the Highway orany defect <strong>in</strong> the Highway (<strong>in</strong> any such case whenever caused and whetheror not known to the Implement<strong>in</strong>g Authority or any Relevant Authority);the physical conditions or obstructions on the Site (both above ground andsubsurface and whether artificial or not) whether foreseen or unforeseenwhich are encountered dur<strong>in</strong>g Construction Works or otherwise.7.6.2 The Concessionaire shall <strong>in</strong>demnify and keep <strong>in</strong>demnified the Implement<strong>in</strong>gAuthority dur<strong>in</strong>g the Concession Period and thereafter aga<strong>in</strong>st any costs, loss orexpense <strong>in</strong>curred by the Implement<strong>in</strong>g Authority aris<strong>in</strong>g out of or <strong>in</strong> connection with:(a)the conservation of the Environment of the Site and the area impacted by theProject dur<strong>in</strong>g the Concession Period;29<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> <strong>Resource</strong> <strong>Center</strong> for Contracts, Laws and Regulations (<strong>PPP</strong>IRC)Reviewed: Robert Phillips, LEGPShttp://www.worldbank.org/ppp February 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!