11.8 Modifications dur<strong>in</strong>g Concession Period11.8.1 Modifications to the Highway shall be subject to the prior written consent andprocedures of the Implement<strong>in</strong>g Authority.11.8.2 Any such modifications to the Highway accomplished dur<strong>in</strong>g the Concession Periodshall be subject to the provisions set forth <strong>in</strong> this Clause 11.11.8.3 The Concessionaire shall not construct any additional exit or entry po<strong>in</strong>ts on theHighway without the consent of the Implement<strong>in</strong>g Authority. Where at any timedur<strong>in</strong>g the Concession Period the Implement<strong>in</strong>g Authority requires additional exit orentry po<strong>in</strong>ts to be constructed on the Highway or modifies any Implement<strong>in</strong>gAuthority Requirements, such modification shall be deemed to be a variation of theConstruction Works by the Implement<strong>in</strong>g Authority for the purpose of Clause 8.1.3.11.9 Traffic and Penalties11.9.1 Dur<strong>in</strong>g the Concession Period, the Concessionaire shall ensure that, subject to theother provisions of this Concession Contract the Highway is open to traffic at alltimes and that the traffic flow along the Highway is convenient and safe at all times.11.9.2 (a) If the Concessionaire fails to perform any of the obligations specified <strong>in</strong> subclauses(i) to (iv) below, the Implement<strong>in</strong>g Authority, or its representative,shall notify the Concessionaire and the Lenders of such failure and, if theConcessionaire shall fail to rectify such failure to the satisfaction of theIndependent Eng<strong>in</strong>eer with<strong>in</strong> the reasonable period specified for suchrectification <strong>in</strong> such notice, the Concessionaire shall pay to the Implement<strong>in</strong>gAuthority for such default the penalties specified <strong>in</strong> relation to that failure asfollows:(i)(ii)(iii)if the Concessionaire fails to adhere to the traffic managementprocess<strong>in</strong>g standards as set forth <strong>in</strong> Annexure III and as moreparticularly specified <strong>in</strong> the Operation and Ma<strong>in</strong>tenance Manuals, itshall pay a penalty per day dur<strong>in</strong>g which such breach persistsrepresent<strong>in</strong>g 2.5% (two and a half per cent) of the Daily Gross TollRevenue for the Highway Section <strong>in</strong> respect of which such failureoccurred;if the Concessionaire fails to report electronic problems timeously or tocause the electromechanical equipment to be properly ma<strong>in</strong>ta<strong>in</strong>ed, theConcessionaire shall pay a penalty per day dur<strong>in</strong>g which such breachpersists represent<strong>in</strong>g 2% (two per cent) of the Daily Gross TollRevenue for the Highway Section <strong>in</strong> respect of which such failureoccurred;for any failure to keep the roadside and toll facility <strong>in</strong> good order andstate of cleanl<strong>in</strong>ess, the Concessionaire shall pay a penalty per daydur<strong>in</strong>g which such breach persists represent<strong>in</strong>g an amount equal to 3%(three per cent) of the Daily Gross Toll Revenue for the HighwaySection <strong>in</strong> respect of which such failure occurred;43<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> <strong>Resource</strong> <strong>Center</strong> for Contracts, Laws and Regulations (<strong>PPP</strong>IRC)Reviewed: Robert Phillips, LEGPShttp://www.worldbank.org/ppp February 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!