8.2 CommencementSubject and without prejudice to the Implement<strong>in</strong>g Authority's obligations underClause 7.2, the Concessionaire shall be entitled to commence construction of theInitial Construction Works at any time after the Effective Date provided thatConstruction Commencement of the Initial Construction Works shall be effected notlater than 40 Bus<strong>in</strong>ess Days after the Effective Date.8.3 CompletionConstruction Completion of the Initial Construction Works on any Highway Sectionshall be effected not later than the dates specified <strong>in</strong> Annexure I <strong>in</strong> respect of thatHighway Section except as such dates may be otherwise extended pursuant to thisConcession Contract.8.4 Environmental Regulations8.4.1 The Concessionaire shall, at its cost, comply with the Environmental Requirementsof Annexure IV.8.4.2 The Implement<strong>in</strong>g Authority shall use all reasonable endeavours <strong>in</strong> assist<strong>in</strong>g theConcessionaire to obta<strong>in</strong> any environmental permits required by the Concessionaireto perform the Project and its obligations under this Concession Contract provided,however, that the Implement<strong>in</strong>g Authority shall bear no liability for any failure of theConcessionaire to obta<strong>in</strong> such permits.8.4.3 In perform<strong>in</strong>g the Project and its functions under this Concession Contract, theConcessionaire shall take all necessary steps to ensure that appropriate pollutioncontrol and other environmental protection measures are taken by itself and itsagents, servants, employees and sub-<strong>contract</strong>ors <strong>in</strong> accordance with any applicablelaws or regulations.8.5 Access to the Site and FacilitiesThe Implement<strong>in</strong>g Authority or any of its designated representatives may from timeto time, enter any part of the Site but, <strong>in</strong> respect of those parts of the Site on whichConstruction Works are be<strong>in</strong>g carried out, only at reasonable times and onreasonable prior notice to the Concessionaire and the relevant Contractor providedthat the Implement<strong>in</strong>g Authority or its designated representative must comply withthe reasonable safety requirements of the Concessionaire or Contractor whichgenerally apply. The Concessionaire shall provide the Independent Eng<strong>in</strong>eer withadequate office space and facilities at the Site <strong>in</strong> accordance with the requirementsof the Independent Eng<strong>in</strong>eer's Agreement and shall provide copies of all <strong>in</strong>formationand reports which are furnished to the Implement<strong>in</strong>g Authority also to theIndependent Eng<strong>in</strong>eer. The Concessionaire and the Implement<strong>in</strong>g Authority shallco-operate fully with the Independent Eng<strong>in</strong>eer <strong>in</strong> the performance of its duties.35<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> <strong>Resource</strong> <strong>Center</strong> for Contracts, Laws and Regulations (<strong>PPP</strong>IRC)Reviewed: Robert Phillips, LEGPShttp://www.worldbank.org/ppp February 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!