12.07.2015 Views

Port of Abbot Point Development Guidelines - North Queensland ...

Port of Abbot Point Development Guidelines - North Queensland ...

Port of Abbot Point Development Guidelines - North Queensland ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Specific OutcomesSolutionsSO6.<strong>Development</strong> affecting land below the highwater mark (such as landings, ramps,berthing facilities and retaining walls) isdesigned and constructed according torequirements <strong>of</strong> relevant Commonwealth orState legislation and standards and mustbe approved by a Registered Pr<strong>of</strong>essionalEngineer <strong>of</strong> <strong>Queensland</strong> (RPEQ).S6.1.No solution provided.SO7.The design and operation <strong>of</strong> buildings andstructures incorporates sustainability andenvironmental management principles,particularly with regard to:• waste management;• energy use and loss;• water use and reuse;• contribution to greenhouse gases;• ventilation; and• heat gain and loss.SO8.<strong>Development</strong> contributes to creating asocially, visually and physically amenablework environment.In partial satisfaction <strong>of</strong> SO7.S7.1.Commercial and <strong>of</strong>fice buildings achieve asa minimum a 4 ½ star rating under theNational Australian Built Environment RatingSystem (NABERS).S7.2All new structures include:• use <strong>of</strong> building materials and featureswhich are suitable for the local climate(including sun shading devices onbuildings);• provision for natural light andventilation, privacy and noiseattenuation;• energy efficient lighting and airconditioning;• provision <strong>of</strong> landscaping to provideshading and screening, using endemicnative species where possible;• features that allow waste to beminimised in the first instance andrecycling and reuse <strong>of</strong> waste;• stormwater collection and reuse; and• water saving measures on tap fittingsand toilets.In partial satisfaction <strong>of</strong> SO8.S8.1.On site areas for staff amenity andrecreation are provided in locations awayfrom operational areas and incorporate:• weather protection;• seating, tables and rubbish bins;• safe and easy access for employees;and• landscaping.<strong>Port</strong> <strong>of</strong> <strong>Abbot</strong> <strong>Point</strong> <strong>Development</strong> <strong>Guidelines</strong> 2010 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!