12.07.2015 Views

ETAG 022 Watertight covering kits for wet room floors and or walls ...

ETAG 022 Watertight covering kits for wet room floors and or walls ...

ETAG 022 Watertight covering kits for wet room floors and or walls ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

System 1Certification of the con<strong>f<strong>or</strong></strong>mity of the product by a notified certification body on the basis of:(See Annex III.2.(i),of the CPD without audit-testing of samples)(a)(b)Tasks <strong>f<strong>or</strong></strong> the manufacturer:(1) Fact<strong>or</strong>y production control;(2) Further testing of samples taken at the fact<strong>or</strong>y by the manufacturer in acc<strong>or</strong>dance with a prescribed testplan;Tasks <strong>f<strong>or</strong></strong> the notified body:(3) Initial type–testing of the product;(4) Initial inspection of fact<strong>or</strong>y <strong>and</strong> of fact<strong>or</strong>y production control;(5) Continuous surveillance, assessment <strong>and</strong> approval of fact<strong>or</strong>y production control.System 3Declaration of con<strong>f<strong>or</strong></strong>mity of the product by the manufacturer on the basis of:(See Annex III.2.(ii), Second possibility of the CPD)(a)(b)Tasks <strong>f<strong>or</strong></strong> the manufacturer:(1) Fact<strong>or</strong>y production control;Tasks <strong>f<strong>or</strong></strong> the notified body:(2) Initial type testing of the product.System 4Declaration of con<strong>f<strong>or</strong></strong>mity of the product by the manufacturer on the basis of:(Annex III.2. (ii), Third possibility of the CPD)(a)Tasks <strong>f<strong>or</strong></strong> the manufacturer:(1) Initial type testing of the product;(2) Fact<strong>or</strong>y production control.3.2 Tasks <strong>and</strong> responsibilities of the manufacturer <strong>and</strong> notified bodiesIn transposing the relevant systems of attestation of con<strong>f<strong>or</strong></strong>mity to the approved kit, the approval body has to lay downthe specific tasks of the manufacturer <strong>and</strong> the notified body in the process of attestation of con<strong>f<strong>or</strong></strong>mity in control plans.Both large <strong>and</strong> small companies produce these products <strong>and</strong> there is a wide variation in the materials <strong>and</strong> test methodsused. There<strong>f<strong>or</strong></strong>e a precise test plan can only be set up on a case-by-case basis.In general it is not necessary to conduct tests on complete <strong>kits</strong> <strong>or</strong> applied systems. Indirect methods will n<strong>or</strong>mally besufficient, e.g. control of raw materials, manufacturing processes <strong>and</strong> properties of components.The following gives general c<strong>or</strong>nerstones on how to write these control plans <strong>f<strong>or</strong></strong> the product family of this <strong>ETAG</strong>. Theyshall be specified <strong>and</strong> filled in by the approval body <strong>f<strong>or</strong></strong> the approved product under consideration of the specifiedproduction process of the manufacturer.It is assumed that the characteristics given in the following control plans have a c<strong>or</strong>relation to the properties of theproducts both <strong>f<strong>or</strong></strong> the water tightening function <strong>and</strong> the reaction to fire.24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!