12.07.2015 Views

ETAG 022 Watertight covering kits for wet room floors and or walls ...

ETAG 022 Watertight covering kits for wet room floors and or walls ...

ETAG 022 Watertight covering kits for wet room floors and or walls ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.2.2.2 Assessment of the fact<strong>or</strong>y production control system - initial inspection <strong>and</strong> continuoussurveillanceThe Assessment of the fact<strong>or</strong>y production control system is the responsibility of the notified body.The assessment shall be carried out of each production unit to demonstrate that the fact<strong>or</strong>y productioncontrol is in con<strong>f<strong>or</strong></strong>mity with the ETA <strong>and</strong> any subsidiary in<strong>f<strong>or</strong></strong>mation. This assessment shall be basedon an initial inspection of the fact<strong>or</strong>y.Subsequently continuous surveillance of fact<strong>or</strong>y production control is necessary to ensure continuingcon<strong>f<strong>or</strong></strong>mity with the ETA.It is recommended that surveillance inspections be conducted once a year but if necessary i.e. if theresults of the first inspection is unsatisfact<strong>or</strong>y it may be required to be done m<strong>or</strong>e often e.g. twice peryear.3.2.2.3 Certification of product <strong>or</strong> Fact<strong>or</strong>y Production ControlWhen the criteria of the assessment of the fact<strong>or</strong>y production control are fulfilled the notified body shallissue the Certification of the product (system 1) <strong>or</strong> the Certification of the Fact<strong>or</strong>y Production Control(system 2+).3.3 CE marking <strong>and</strong> accompanying in<strong>f<strong>or</strong></strong>mationAcc<strong>or</strong>ding to Council Directive 93/68/EEC 6 the CE marking consists of the letters "CE", followed by the identificationnumber of the notified certification body, where applicable (<strong>f<strong>or</strong></strong> AoC systems 1 <strong>and</strong> 2+).The ETA shall indicate the in<strong>f<strong>or</strong></strong>mation to accompany the CE marking, i.e.- The name <strong>or</strong> identifying mark of the producer <strong>and</strong> the manufacturing plant,- The last two digits of the year in which the CE marking was affixed,- F<strong>or</strong> AoC systems 1: the number of the EC certificate of con<strong>f<strong>or</strong></strong>mity <strong>f<strong>or</strong></strong> the product, 7- F<strong>or</strong> AoC systems 2+ : the number of the EC certificate <strong>f<strong>or</strong></strong> the FPC,- The number of the European technical approval..Example of CE-Marking <strong>and</strong> accompanying in<strong>f<strong>or</strong></strong>mation:"CE"-symbolnnnn Number of Notified Body (<strong>f<strong>or</strong></strong> AoC system 2+)Any CompanyStreet 1CountryPlant 1YyName <strong>and</strong> address of the ETA-holder <strong>or</strong> his representativeestablished in the EEA <strong>and</strong> of the plant where the kit wasmanufacturedTwo last digits of year of affixing CE Markingnnnn-CPD-xxxxNumber of EC certificate of con<strong>f<strong>or</strong></strong>mity (<strong>f<strong>or</strong></strong> AoC systems 1) <strong>or</strong> ECcertificate <strong>f<strong>or</strong></strong> the FPC (<strong>f<strong>or</strong></strong> AoC systems 2 <strong>and</strong> 2+)ETA-YY/WWWWETA Number<strong>ETAG</strong> <strong>022</strong> – part 3 <strong>ETAG</strong> <strong>022</strong> – part 36 Official Journal of the European Communities no L 220, 30/8/1993, p. 1.7 Acc<strong>or</strong>ding to Guidance Paper D (this is not envisaged in the CPD itself)28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!