12.07.2015 Views

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Scope of Work• <strong>Reliance</strong> <strong>Jamnagar</strong> Manufacturing Division loc<strong>at</strong>ed inGujar<strong>at</strong> st<strong>at</strong>e of India being largest greenfield refinerycomplex in world and comprising two no’s of refinerycomplex’s loc<strong>at</strong>ed adjacent to each other was selected asfirst loc<strong>at</strong>ion to be upgraded on <strong>TETRA</strong>.• In phase one of <strong>Jamnagar</strong> complex three no’s ofBTS(MTS4) and 1141 no’s of radio terminals wereinstalled and commissioned in 2008 and have been inoper<strong>at</strong>ion till d<strong>at</strong>e.• In Phase two of <strong>Jamnagar</strong> complex three no’s ofBTS(MTS4) and 1000 no’s of radio terminals are ordered.• Other install<strong>at</strong>ions are in planning stage.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!