12.07.2015 Views

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Jamnagar</strong> <strong>Refinery</strong> ComplexPHASE 1 System Configur<strong>at</strong>ion• Three-Site Scaleable UHF Dimetra IP System, which comprises of thefollowing:– 1 X Mobile Switching Office (MSO)– Zone Controller in Redundant Configur<strong>at</strong>ion– Network Management System– Network Switching Components in Redundant Configur<strong>at</strong>ion– Telephone Interconnect G<strong>at</strong>eway– Short D<strong>at</strong>a Router– Packet D<strong>at</strong>a G<strong>at</strong>eway– Conventional G<strong>at</strong>eway– VPN G<strong>at</strong>eway– 1 x Control Center– One (1) Disp<strong>at</strong>ch Console– One (1) Network Management Terminal with One (1) Laser Printer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!