12.07.2015 Views

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

Case Study: TETRA at Reliance Jamnagar Refinery

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Jamnagar</strong> <strong>Refinery</strong> ComplexIn-Building Solution for Control Room• The <strong>Refinery</strong> Control room building is a blast proof concretebuilding. It was observed th<strong>at</strong> the outdoor base st<strong>at</strong>ion signal maynot penetr<strong>at</strong>e the control room for enabling Tetra coverage insidethe control room.• <strong>Refinery</strong> control room being heart of control for refinery oper<strong>at</strong>ions,required communic<strong>at</strong>ions <strong>at</strong> all times so as to be reachable by plantteams and reach the plant teams.• With a large group of users working 24x7 inside control room,separ<strong>at</strong>e In-Building solution has been designed and deployed forthe control room.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!