12.07.2015 Views

Conveyance and Service Agreement SAMPLE form - FGUA

Conveyance and Service Agreement SAMPLE form - FGUA

Conveyance and Service Agreement SAMPLE form - FGUA

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9. That the execution of this <strong>Agreement</strong> by the <strong>FGUA</strong> shall not be construed as aprecedent for the acceptance by the <strong>FGUA</strong> of other potable water, reclaimed water <strong>and</strong>/orwastewater facilities constructed or to be constructed by Developer or others, on other properties.10. No substance other than Domestic Wastewater, as such term is defined by theFlorida Department of Environmental Protection, or a successor agency with jurisdiction over same(the "FDEP"), shall be placed into the wastewater system <strong>and</strong> delivered to an <strong>FGUA</strong> line. Should anydischarge to the wastewater system not meet Domestic Wastewater criteria as set forth by the FDEP,Developer, or any subsequent owner in interest, shall become subject to the <strong>FGUA</strong> IndustrialPretreatment St<strong>and</strong>ards as said st<strong>and</strong>ards exist at that time, <strong>and</strong> a separate agreement shall berequired for the <strong>FGUA</strong> to provide such service.11. This <strong>Agreement</strong> is intended to supplement the policies <strong>and</strong> procedures of the <strong>FGUA</strong>.This <strong>Agreement</strong> is not intended to replace any provisions of, or relieve Developer of the obligation tocomply fully with, all policies <strong>and</strong> procedures of the <strong>FGUA</strong>. To the extent that any direct conflictarises between the terms of this <strong>Agreement</strong> <strong>and</strong> the term of any <strong>FGUA</strong> resolution or other <strong>FGUA</strong>policies <strong>and</strong> procedures, the other <strong>FGUA</strong> policies <strong>and</strong> procedures shall control over the terms of this<strong>Agreement</strong>.6


IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed on theday <strong>and</strong> year first hereinabove written.Florida Governmental:Utility AuthorityATTEST:_______________________ClerkBY: __________________________ChairAPPROVED AS TO FORM ANDLEGAL SUFFICIENCYBY: _____________________________<strong>FGUA</strong> ATTORNEY7


Signed, sealed <strong>and</strong> deliveredin the presence of:____________________________WitnessDEVELOPER: COMPANY'S LEGAL NAME___________________________________Print Name <strong>and</strong> Title____________________________Print Name____________________________Witness____________________________Print NameState of __________________County of _________________The foregoing instrument was acknowledged before me this ______ day of ________, ______ byNAME OF PERSON AUTHORIZED TO CONVEY PROPERTY as TITLE OF PERSON EXECUTINGINSTRUMENT for LEGAL NAME OF DEVELOPER on behalf of the Developer. He/she is personallyknown to me or has produced _______________________ as identification.__________________________________________Name typed:__________________________Notary Public Commission_______________My Commission Expires:________________8


Exhibit "A"Provide Legal Description <strong>and</strong> small scale graphic depiction.9


Project Name:Project #:DateReceivedExhibit BFLORIDA GOVERNMENTAL UTILITY AUTHORITYDEVELOPER CONVEYANCE CHECKLISTSystem:County:ItemRequiredYes / NoItem DescriptionYES <strong>Conveyance</strong> <strong>Agreement</strong> *YES Warranty Deed *YES Utility Easement (s) dedicated to <strong>FGUA</strong> *YES Bill of Sale – Water *YES Bill of Sale – Wastewater *YES Bill of Sale - Reclaimed Water *YES Attorney’s Affidavit *YES Owner’s Affidavit (with legal description attached) *YES Releases of Lien (from all subcontractors <strong>and</strong> material providers)YES Owner's Waiver <strong>and</strong> Release *YES Manufacturer’s Warranties (transferred to <strong>FGUA</strong>)YES Contractor's Letter of WarrantyYES Engineers certification of construction completion *YES M<strong>and</strong>rel, Low Pressure Air, TVing, Lamping Results (gravity)YES Pressure test results (force mains)YES Pressure tests (water mains)YES Pressure tests (reclaimed mains)YES Bacteriological tests (water main)YES Backflow Preventer CertificationYES Lift station start up report <strong>and</strong> O&M manual(s)YES Lift station calculation with shop drawingsYES FDEP certification of completion for wastewater system applicationYES HRS/FDEP request for certification for water system applicationYES 1 copy of final plat CAD <strong>and</strong> PDF disk <strong>and</strong> one hard copy (11X17) *YES 2 sets of "As-Built" plans full size & one 11x17YES 1 CAD <strong>and</strong> PDF disk of "As-Built" plansYES Assignment <strong>and</strong> assumption agreement *ReviewedbyItems below to be completed AFTER <strong>FGUA</strong> Board Acceptance of Closeout PackageYES FDEP/HRS water clearanceYES FDEP/HRS wastewater clearanceYES Final walk through by <strong>FGUA</strong> inspectorYES <strong>FGUA</strong> final acceptance <strong>and</strong> meter release letter processedThose items marked with a YES are to be submitted in one package <strong>and</strong> approved prior to <strong>FGUA</strong> signature ofFDEP /HRS certification applications. * Indicates items to be included in the <strong>FGUA</strong> Board packageDate10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!