12.07.2015 Views

laterites - ALTA Metallurgical Services

laterites - ALTA Metallurgical Services

laterites - ALTA Metallurgical Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PAL PROCESS (cont.)• Since then, five PAL plants (not including the RavensthorpeEPAL plant) have been constructed and are either operating orin commissioning; a further two are under construction.• The main driving forces for the PAL projects include:– Increased nickel demand and higher price.– Availability of numerous low grade laterite deposits.– Higher energy efficiency and higher nickel and cobalt recoveries thanthe Caron Process.– Longevity of the Moa Bay operation.– Successful commercial application of horizontal autoclaves and relatedfacilities for pressure leaching of other ores such as gold and zinc.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!