Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

38. The contract period can be extended at the discretion <strong>of</strong> V.S.P. up to 04 (Four) months at the existingRates, Terms and conditions and the <strong>Contract</strong>or shall be bound to execute the work accordingly and the<strong>of</strong>fer <strong>of</strong> the <strong>Contract</strong>or is deemed to include this aspect.39. The Tenderers shall note that in case <strong>of</strong> quoting above the Estimated Value <strong>of</strong> V.S.P. the L-1 party shallfurnish logical / satisfactory explanation which V.S.P. may seek if felt necessary for quoting such highrates. If the explanation <strong>of</strong>fered by the L-1 party is not acceptable to V.S.P., the L-1 party may berecommended for disqualification while retendering the work.40. The contractor should clearly understand and comply with the Factories Act 1948 and relieve the FEMALEWORKERS from their work site within the restricted working hours prescribed therein under section 66(b).41. The following deductions per workman deployed category-wise shall be made from the bills/ amounts dueto the <strong>Contract</strong>or as applicable for the work done and such deducted amounts shall be released asfollows:Recovery amount per labour perS.NoComponentevery Working Day (in `.)To be released whenUN- SEMI-SKILLEDSKILLED SKILLED01 Notice pay 16.93 19.35 22.11 After the <strong>Contract</strong>or makes payment to0203Retrenchmentcompensation8.47 9.67 11.05Leave withwages10.42 11.91 13.60Sub-total 35.82 40.93 46.7604 Bonus 11.55 11.55 11.55Grand total (To be paidto the Laborer)47.37 52.48 58.3110% towards pr<strong>of</strong>it andoverheads <strong>of</strong> contractor4.74 5.25 5.83Total Recovery amount 52.11 52.73 64.14the workmen in the presence <strong>of</strong>Engineer I/C and CLC representatives. Acertificate to this effect is to beenclosed with pre-final bill. (to be paidwith pre-final bill)After the <strong>Contract</strong>or makes payment tothe workmen in the presence <strong>of</strong>Engineer I/c and CLC representatives. Acertificate to this effect is to beenclosed with RA bill / pre-final bill. (tobe paid with RA bill / pre-final bill as andwhen paid by the <strong>Contract</strong>or)Note:i) The above recovery rates are effective from 01.10.2010. In case <strong>of</strong> any statutory revision inminimum wages payable to contract workmen as notified by the Regional Labour Commissioner(Central), Hyderabad from time to time, the above amounts for workmen category-wise will berevised by RINL/VSP and will be notified accordingly.ii) Payment against the above components is to be made to the workmen based on effective wages <strong>of</strong>last drawn pay.42. PAYMENT MODE FOR BILL AMOUNTS:42.1 Following are the options available to the <strong>Contract</strong>ors for availing e-payments.42.1.1 EFT System: Under this system Banks <strong>of</strong>fer their customers money Transfer service from account <strong>of</strong>any bank branch to any other Bank Branch. The EFT system presently covers all the branches <strong>of</strong> about77 banks located at 15 centers indicated below, where clearing houses are managed by RBI i.e.,i) New Delhi, ii) Chandigarh, iii) Kanpur, iv) Jaipur, v) Ahmedabad, vi) Mumbai, vii) Nagpur, viii)Hyderabad, ix) Bangalore, x) Chennai, xi) Trivendrum, xii) Kolkata, xiii) Bhubaneswar, xiv) Guwahati,xv) Patna.42.1.2 Direct Credit: Suppliers opting for this system may open Bank accounts with any one <strong>of</strong> the followingbanks.i) State Bank <strong>of</strong> India - <strong>Steel</strong> Plant Branchii) Canara Bank - <strong>Steel</strong> Plant Branchiii) Bank <strong>of</strong> Baroda - <strong>Steel</strong> Plant Branchiv) State Bank <strong>of</strong> Hyderabad - <strong>Steel</strong> Plant Township Branchv) Andhra Bank - <strong>Steel</strong> Plant Township Branchvi) UCO Bank - <strong>Steel</strong> Plant Township Branchvii) IDBI - Visakhapatnam BranchPage 10 <strong>of</strong> 16Signature <strong>of</strong> the Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!