12.07.2015 Views

Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

Period of Contract : 12 (Twelve) Months Defect Liability ... - Vizag Steel

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ADDITIONAL SPECIAL CONDITIONS TENDER NO : 71453Proposal No 329091100900Work DescCond No01Cleaning cum spillage arresting jobs in ACP, GCP, FFPH, SDPH andFB <strong>of</strong> Sinter PlantCond DescSales tax clause:The scope <strong>of</strong> supply <strong>of</strong> material and consumables in the present proposalare as follows:a. Material to be supplied by VSP : Nilb. Consumables to be supplied by VSP : Nilc. Material to be supplied by <strong>Contract</strong>or : Nild. Consumables to be supplied by <strong>Contract</strong>or : NilThe deduction <strong>of</strong> sales tax shall be done as per the rules prevailingfrom time to time.02030405060708091011<strong>12</strong>13Proper safety precautions should be taken during the execution <strong>of</strong> thework.The representative must be present during the execution <strong>of</strong> the work.Proper work permit has to be taken from the concerned engineer beforestarting <strong>of</strong> work.Safety <strong>of</strong> the workman will be the responsibility <strong>of</strong> the contractor.Height passes are to be arranged whenever required.The agency may have to work in some other area <strong>of</strong> sinter plant, which isnot covered in his scope <strong>of</strong> the work. Payments for such job will bemade as per the rate in bill <strong>of</strong> quantity for the work done.As most <strong>of</strong> the equipment in sinter plant is moving machinery it will notbe safe for ladies to work in these areas. No ladies are allowed inthose areas.All the workers <strong>of</strong> the contractor must wear ISI marked safety appliances(which are to be provided by the contractor) on the job as per safetynorms.<strong>Contract</strong>or should obtain proper shut down in prescribed format beforestarting the job on conveyors and equipment.Workers should not touch any running equipment and also should not crossunderneath the running/stopped conveyors.In case <strong>of</strong> any accident the contractor should immediately inform it tothe concerned area in-chargeWhile working at heights safety belt to be use.Safety Clause :The contractor shall ensure usage <strong>of</strong> ISI marked regulators, Hoses,nozzles, cutting torches, welding holders and cables for the cutting andwelding works. This must be adhered to strictly.Page 14 <strong>of</strong> 16Signature <strong>of</strong> the Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!