SCOPE OF WORK TENDER NO : 71453Work Desc :Cleaning cum spillage arresting jobs in ACP, GCP, FFPH, SDPH andFB <strong>of</strong> Sinter Plant1011<strong>12</strong>13141516The contractor should be able to mobilize the extra manpower as and whenrequired due to certain unforeseen condition with in a notice period <strong>of</strong> 24hrs.The cleaned material should be put on conveyors. It should not be kept oneither side <strong>of</strong> the conveyors or thrown down on floors. In this regardinstruction <strong>of</strong> the site engineer is to be followed.The contractor or his representative should report to the Engineer daily inthe morning by 9.00 AM after deploying the workmen on work. The worknormally should be carried out in 'G' shift timings only. Howeverdepending upon situation, it has to be continued further or a contractormay have to put laborers in A,B & C shifts also as and when required<strong>Contract</strong>or has to ensure proper supervision during the execution <strong>of</strong> work.Day and Night, Sunday and holiday passes are to be kept ready all the time.The tenderer should clearly understand and comply with factories act, 1948and relieve the FEMALE WORKERS from their work-site within the restrictedworking hours prescribed therein under section 66(b)Required no. <strong>of</strong> manpower is to be deployed in SDPH through out the yearincluding sundays and holidays.Page 13 <strong>of</strong> 16Signature <strong>of</strong> the Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!